Scenario C- • It has been decided that a two mile long bridge must be constructed to connect two areas along a coast. Officials believe this will promote tourism because it will connect two areas that are currently separated by a 30 minute drive. This bridge will span a wetland where the tides come in and out. Typically at a low tide much of the area is dry; however, a narrow channel remains navigable by small vessels except at extremely low tides. The average tidal range is around five feet. The development should also include a small community boat ramp, dock, and public facilities.
The 2 Mile Long Bridge • The measurement of the length of the bridge is close to – 2.25 miles long (Driving length) • Materials- Steel, Concrete, Water, Nuts&Bolts, Rebar.
Differences in Bridge Designs • We overall chose our previous slide's design, but we had differences in the overall design. Some of us wanted to use a “draw bridge” for boats going underneath the bridge so there would be an unlimited height in what size boats could go underneath. That would overall slow down traffic because its a one lane bridge plus the “draw bridge” would make it even slower causing back ups.
Individual Job • Amber – Environmental Engineer • Makes sure the bridge is safe for the environment • C.J. - Cost Estimator • Budgets the job, estimates the overall cost of the job. • Jesse – Bridge Inspector/ Code Enforcement • Inspects the bridge, makes sure it's safe • Donald – Structural Engineer • Designs/Tests the overall bridge before the actual bridge is built. • Owen – Construction Manager • Keeps the job under budget, directs the workers. • David – Urban Planner • Decides location and how it affects the community.