1 / 8

1.2.2 Design Charette

By: C.J. Wyatt David Panyathong Amber Dannemiller Owen Sill Donald Jacobson Jesse Sopko. 1.2.2 Design Charette. Scenario C-.

lorant
Download Presentation

1.2.2 Design Charette

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. By: C.J. Wyatt David Panyathong Amber Dannemiller Owen Sill Donald Jacobson Jesse Sopko 1.2.2 Design Charette

  2. Scenario C- • It has been decided that a two mile long bridge must be constructed to connect two areas along a coast. Officials believe this will promote tourism because it will connect two areas that are currently separated by a 30 minute drive. This bridge will span a wetland where the tides come in and out. Typically at a low tide much of the area is dry; however, a narrow channel remains navigable by small vessels except at extremely low tides. The average tidal range is around five feet. The development should also include a small community boat ramp, dock, and public facilities.

  3. The 2 Mile Long Bridge • The measurement of the length of the bridge is close to – 2.25 miles long (Driving length) • Materials- Steel, Concrete, Water, Nuts&Bolts, Rebar.

  4. Differences in Bridge Designs • We overall chose our previous slide's design, but we had differences in the overall design. Some of us wanted to use a “draw bridge” for boats going underneath the bridge so there would be an unlimited height in what size boats could go underneath. That would overall slow down traffic because its a one lane bridge plus the “draw bridge” would make it even slower causing back ups.

  5. Individual Job • Amber – Environmental Engineer • Makes sure the bridge is safe for the environment • C.J. - Cost Estimator • Budgets the job, estimates the overall cost of the job. • Jesse – Bridge Inspector/ Code Enforcement • Inspects the bridge, makes sure it's safe • Donald – Structural Engineer • Designs/Tests the overall bridge before the actual bridge is built. • Owen – Construction Manager • Keeps the job under budget, directs the workers. • David – Urban Planner • Decides location and how it affects the community.

  6. Concept map

More Related