1 / 6

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-SG Closing Report for Dallas, Texas November 2010 Date Submitted: November 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless

lottie
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:LECIM-SG Closing Report for Dallas, Texas November 2010 Date Submitted: November 2010 Source:David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858)592-6008 x221 , E-Mail: david.a.howard@ieee.org Re:LECIM Closing Report for November 2010 Session Abstract: LECIM Closing Report for Dallas, Texas Purpose: Information to 802.15 WG Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 David Howard, On Ramp Wireless

  2. Low Energy Critical Infrastructure Monitoring Tuesday EV1: • Draft PAR and 5C comment discussion • Responses to individual comments prepared • Initial revisions to PAR and 5C discussed and captured into document 15-10-0894-00-leci David Howard, On Ramp Wireless

  3. Low Energy Critical Infrastructure Monitoring Wednesday AM1: • Draft PAR and 5C comment discussion, review and editing. • PAR and 5C revised based on comments, and resolutions contained in 15-10-0894-03-leci • Motion to submit revised PAR and 5C to WG passed David Howard, On Ramp Wireless

  4. LECIM SG SG Motion Motion to submit to the IEEE 802.15 working group the revised PAR 756R8 and 5C 757R4 documents. Moved by: Evan Green (self) Second by: Shu Kato (NICT) • 32 for • 0 against • 0 abstain Motion Carries David Howard, On Ramp Wireless

  5. LECIM SG WG Motion Request that the PAR and Five Criteria contained in documents 15-10-0756-08 and 15-10-0757-04 be approved by the IEEE 802.15 WG and that the EC be requested to forward the PAR to NESCOM. Moved by: David Howard (On-Ramp Wireless, Inc.) Second by: Shu Kato (NICT) • 70 For • 0 Against • 0 Abstain Motion Carries David Howard, On Ramp Wireless

  6. LECIM SG The two sessions were attended by more than 32individuals, representing more than 24organizations. Comments and resolutions: doc: IEEE 802.15-10-0894-03-leci Meeting minutes (draft): doc: IEEE 802.15-10-0904-00-leci SG LECIM Draft PAR: doc: IEEE 802.15-10-0756-08-leci SG LECIM Draft 5C: doc: IEEE 802.15-10-0757-04-leci David Howard, On Ramp Wireless

More Related