1 / 15

GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.

GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. Capital Improvement Plan. Highlights of Upcoming Projects. BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Airfield Improvements (2012) BP-402A-D, Landside Emergency Electrical Infrastructure Improvements – Phase 2

lotus
Download Presentation

GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.

  2. Capital Improvement Plan

  3. Highlights of Upcoming Projects • BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Airfield Improvements (2012) • BP-402A-D, Landside Emergency Electrical Infrastructure Improvements – Phase 2 • BP-402E, Airside 4 Emergency Power Infrastructure Improvements • BP-411, Taxiway A Widening and Related Work (2012) • BP-418, Baggage Handling System Renovation (Design/Build) • BP-419, Baggage Handling System Infrastructure Renovation • BP-427, CCTV Renovation • BP-428, Taxiway B-2 Extension and Taxiway B-1 Rehabilitation (2011) • BP-429, Enplane Drives Structural Rehabilitation • E022, Airside 4 APM Switchgear Replacement • V-445, Landside Level 2 FIDS Replacement (Design/Build) • V-562, Hyatt Air Handling Unit Replacement - Phase 2 • V-578, Hyatt Water Pipe Replacement – Phase 2 • V-581, Airside 4 FIS Relocation • V-582, Airside 4 HVAC Improvements • V-584, Airside 4 APM Guideway Rehabilitation

  4. BP-039, OEA Taxiway E Rehabilitation and Miscellaneous Improvements Project Scope Rehabilitation of existing pavement for Taxiway E, area north of Runway 7-25, install airfield signage and pavement marking, and install two high mast lights on the East Ramp Construction Cost Approx. $400 K Duration Nov. 2010 - Jan. 2011

  5. BP-402A-E, Landside Emergency Electrical Infrastructure Improvements – Phase 2 Project Scope Phase 2 of the emergency electrical distribution modifications establishes the infrastructure for security and equipment branches of the Landside Terminal and Airside 4 emergency power system Construction Cost Approx. $20+ M Duration Winter 2011 - Fall 2012

  6. BP-411, Taxiway A Widening and Related WorkBP-428, Taxiway B-2 Extension and Taxiway B-1 Rehabilitation Project Scope Widening of Taxiway A, reconfiguration of current Taxiway A-1, and the extension of Taxiway B-2 from Runway 18L-36R to Taxiway A The extension of Taxiway B-2 from Runway 18L-36R to Runway 18R-36L and associated connecting taxiway to Taxiway B-1 and widening of Taxiway B-1 Construction Cost Approx. $10 M for each Duration Nov. 2011 - Dec. 2012 Nov 2012 – Dec 2013 BP-428 BP-411

  7. BP-418, Baggage Handling System Renovation (Design/Build) Project Scope Replacement of the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $14 M Duration Mar. 2011 – Dec. 2012

  8. BP-419, Baggage Handling System Infrastructure Renovation Project Scope Renovation of the infrastructure for the baggage handling systems in the Delta, AirTran, United, and BA make-up areas Construction Cost Approx. $8 M Duration June 2011 – Feb. 2012

  9. 360 Camera BP-427, CCTV Renovation West Black Diamond Lane Images Project Scope Replacement of the Closed Circuit Television (CCTV) Monitoring System at the Landside Terminal passenger screening checkpoints and Airsides 1 and 4 FIS Construction Cost Approx. $1.5 M Duration Summer 2011 - Summer 2012

  10. BP-429, Enplane Drives Structural Rehabilitation Project Scope Repair to expansion joints, beam seats, and concrete elements of the enplane roadway drive, A and B sides Construction Cost Approx. $1.5 M Duration May 2011 – Nov. 2011

  11. AS1 AS4 AS3 E-022, AS 4 APM Switchgear Replacement Project Scope New enclosure and electrical switchgear at Airside 4 Construction Cost Approx. $600K Duration Apr. 2011 – Sept. 2011

  12. V-445, Landside Level 2 FIDS Replacement Project Scope Remove existing FIDS display cabinets on Level 2 Landside Terminal. Replace with column mounted LCD FIDS at the four entry points to Level 2 from Level 3. Final Construction Cost Approx. $400K Duration Apr. 2011 – Jan. 2012

  13. V-562, Hyatt Air Handling Unit Replacement V-578, Hyatt Water Pipe Replacement – Phase 2 Project Scope Replacement of cold water pipe. Replacement of multiple air handling units. Construction Cost Approx. $300K (Water) Approx. $600K (HVAC) Duration 2011 - 2012

  14. V-581, Airside 4 FIS RelocationV-582, Airside 4 HVAC Improvements Project Scope Upgrade Hub HVAC. Relocate FIS to open concessions space in transfer level. Construction Cost Approx. $1.5M (HVAC) Approx. $200K (FIS) Duration 2011 - 2012

  15. V-584, Airside 4 APM Guideway Rehabilitation Project Scope Crack sealing, crack repairs, concrete running surface sealing, concrete repairs and/or replacement Construction Cost Approx. $500K Duration October 2011 – May 2012