West Plumb Lane Project Preliminary Design Public Information Meeting

West Plumb Lane Project Preliminary Design Public Information Meeting. June 4, 2012. Presentation Goals . Review the project history and community outreach process Present the preferred improvements supported by the community for the Plumb Lane reconstruction project

love
Download Presentation

West Plumb Lane Project Preliminary Design Public Information Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012

  2. Presentation Goals • Review the project history and community outreach process • Present the preferred improvements supported by the community for the Plumb Lane reconstruction project • Provide details on design development • Request input on some design elements • Answer questions and address your concerns

  3. Project Limits

  4. Public EngagementCommunity Outreach To Date • Community Survey • 2 Community Workshops • One-on-one meetings with residents • Meetings with: Councilman Gustin, Councilwoman Zadra, Commissioner Breternitz, Assemblywoman Benitez-Thompson, Caughlin Ranch HOA, Washoe County West Truckee Meadows CAB, City of Reno Ward 1 NAB • Coordination with City of Reno Community Development and Public Works • Coordination with TMWA • Media Interviews • RTC TAC, CAC and BPAC • Reno City Council

  5. Community Engagement Results • Pavement rehabilitation • Bike lanes Presented Three Concepts: 3. Multi-use Path • Pavement • Bike Lanes • Multi-use Path

  6. Preferred Enhancement:Multi-use Path, Parking One Side Multi-use Path

  7. Design Considerations • Address the needs of the community and provide a safe route for all users • Confine improvements to the existing right-of-way • Address traffic volume and excessive speeds • Evaluate possible safety improvements in the steep, curved section east of Homewood Drive • Maintain existing trees and rural character

  8. Existing Conditions

  9. Preferred Enhancement:Multi-use Path, Parking One Side

  10. Multi-use Path, Parking One Side N

  11. Design Considerations Landscaping, mailboxes, fences & parking N

  12. Design ConsiderationsDrainage Options • With Drainage Swale, No Curb and Gutter 50’ ROW 8’ 8’ • With Curb and Gutter, Reduced Landscaping Impact 50’ ROW

  13. Design ConsiderationsTraffic Calming and Speed Plumb Lane Speed Limit Will Remain 25 MPH

  14. Design ConsiderationsTMWA

  15. Construction Schedule & Costs • $3.5 to $4.5 Million • 12 weeks • (Fuel Tax)

  16. How you can help tonight: Provide your input on comment cards • Multi-use path details (concrete color)? • Drainage trouble spots? • Interest in left turn lanes? • Interest in pedestrian crossing? • Interest in paved parking adjacent to property? • Talk to the project team • We are here to listen to you. • Please share your ideas with us! • Thank you!

  17. Information Stations Seven Stations • Station 1: McCarran Boulevard to 3510 West Plumb Lane • Station 2: 3510 West Plumb Lane to Carter Drive • Station 3: Carter Drive to Suda Way • Station 4: Suda Way to Ferris Lane • Station 5: City of Reno • Station 6: NV Energy • Station 7: Design Input

  18. Questions? Contact: Michele Dennis, PE, RTC Project Manager at (775) 335-1861 mdennis@rtcwashoe.com