A Look At The Council’s Conservation Planning Methodology and Assumptions

A Look At The Council’s Conservation Planning Methodology and Assumptions. Tom Eckman Northwest Power and Conservation Council. 2007 Bonneville Power Administration Utility Energy Efficiency Workshop May 17, 2007. Issue – Derivation of the 5 th Plan’s Conservation Goals.

loyceb
Download Presentation

A Look At The Council’s Conservation Planning Methodology and Assumptions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Look At The Council’s Conservation Planning Methodology and Assumptions Tom Eckman Northwest Power and Conservation Council 2007 Bonneville Power Administration Utility Energy Efficiency Workshop May 17, 2007

  2. Issue – Derivation of the 5th Plan’s Conservation Goals • Derived from Integrated Resource Planning Process • Analysis of Portfolio Cost and Risk across range of future conditions (750 futures tested) • Based on a range of future market prices • Accounts for “hedge” benefits of conservation • Non-lost opportunity: $5/MWh over forecast market prices • Lost-opportunity: $10/MWh over forecast market prices

  3. 5th Plan Relies on Conservation and Renewable Resources to Meet Load Growth* *Actual future conditions (gas prices, CO2 control, conservation accomplishments) will change resource development schedule and amounts

  4. Uncertainties Impact Supply Curves(And Foretell the IRP Results) Resource potential for generic coal, gas & wind resources shown for typical unit size. Additional potential is available at comparable costs.

  5. Lost-Opportunity Supply Curves

  6. Non-Lost Opportunity Supply Curve

  7. PNW Portfolio Planning – Scenario Analysis on Steroids Portfolio Analysis Model

  8. Power Cost (NPV 2004 $M)-> Cost = Average Cost Across All Futures Cost for Future 2 Cost for Future 1 10000 12500 15000 17500 20000 22500 25000 27500 30000 32500 Analysis Test 1,000s of “Resource Plans” Against 750 Difference “Futures” Distribution of Cost for a Plan Number of Observations

  9. Cost = Average Cost Across All Futures 10000 12500 15000 17500 20000 22500 25000 27500 30000 32500 Risk and Expected Cost Associated With A Plan Risk = Average Cost of “Worst Outcomes” (>90% threshold Likelihood (Probability) Power Cost (NPV 2004 $M)->

  10. Plans Along the Efficient Frontier Permit Trade-Offs of Costs Against Risk Least Cost Least Risk

  11. A C B D Efficient Frontier Background

  12. The Plan Calls for Accelerating Conservation Development Because it Reduces Cost & Risk

  13. The Plan Calls for Accelerating Conservation Development Because Reduces Carbon Dioxide Emissions

  14. Timing Matters –Three Conservation Deployment Schedules Tested

  15. The 5th PlanCalls for 700 aMW of Savings From 2005 - 2009

  16. Annual Achievable Conservation DeployedFifth Power Plan (Mean Deployment Schedule)

  17. Issue: How Much is Achievable? • How much of the identified conservation potential: • Can we expect to ‘achieve’ • Over what time frame?

  18. Findings • Empirical evidence supports Council’s forecast of achievable conservation potential • Council’s assumed near-term achievable acquisition rates are well supported and may be conservative

  19. Council Conservation Methodology • Regional Act requires that resources are included in the plan if they are available: • ‘at an estimated incremental system cost no greater than that of the least-cost similarly reliable and available alternative’ • This Establishes Three Screening Filters • Technically Feasible • Economically Feasible • Achievable Potential

  20. Achievable Potential ConstraintsFifth Power Plan • Non-Lost Opportunity • Maximum of 120 Average Megawatts/year • 85% of Economically Achievable over 20 years • Lost-Opportunity • 15% of Economically Achievable Savings in first year increasing to 85% by 12-years • About 65% over 20 years • About 50% over 10 years

  21. What Evidence Do We Have? • Hood River Conservation Project • Performance relative to 1983 Plan expectations • Annual BPA & Utility Program Performance

  22. Evidence: Hood River • Hood River Conservation Project • 1982-84 experiment in Hood River County • Try to weatherize all electric-heated homes • Measures installed at no cost to participants • Result: 85% Achieved • 85% of Technically Feasible Residential Weatherization Savings Achieved Over 2 years

  23. Evidence: Performance Relative to 1983 Plan Expectations • New Residential and Commercial Construction (Model Conservation Standards) • Residential Appliances • Residential Water Heating • Commercial Lighting • Commercial HVAC Equipment • Irrigation (kWh/acre) • Industrial

  24. New Buildings & EquipmentCompare 1983 MCS to what Happened • 1983 Model Conservation Standards • 1983 MCS represent 1983 expectations for new buildings & equipment • Compare 1983 MCS to historic: • Building codes • Appliance Efficiency Standards • Market Penetration

  25. Lost-OpportunityResidential New Construction Council Goal 40% Improvement by 2002(85% of 40% = 34%)

  26. Regional Average Annual Space Heating Use of New Single Family Homes Constructed Between 1983 and 2002

  27. 1983 Plan Forecast “0” Market Share of Energy Efficient Manufactured Housing

  28. Residential Water Heating Use

  29. Average Energy Use of New Refrigerators 1983 Plan Baseline 1983 Plan Achievable by 2002 Actual 2002 Use

  30. Average Energy Use of New Freezers 1983 Plan Baseline 1983 Plan Achievable by 2002 Actual 2002 Use

  31. Average Energy Use of New Dishwashers 1983 Plan Baseline 1983 Plan Achievable by 2002 Actual 2002 Use

  32. Average Energy Use of New Clothes Washers 1983 Plan Baseline 1983 Plan Achievable by 2002 Actual 2002 Use

  33. Commercial Lighting Power DensityCodes Surpass 1983 MCS

  34. Change in Lighting Power Density of Existing Buildings

  35. Change in Fluorescent Lighting Efficacy 1983 - 2003

  36. Commercial HVAC Equipment Efficiency Requirements

  37. Irrigation Sector Achievable Potential

  38. Industrial Sector Achievable Potential • 1983 Council’s forecast of achievable conservation potential was equivalent to about 6 percent of non-DSI industrial electric loads • Motors comprise approximately 60 percent of industrial energy use • Federal minimum efficiency standards required 3 - 10 % improvement over 1983 efficiency levels for covered sizes

  39. Other Documented Industrial Sector Efficiency Improvements • 20 to 30 % improvement in multiple cold-storage facilities • 15 to 30 percent improvements in compressed air systems for many plants across different industries • 50 percent in improvement in lighting in manufacturing spaces with high ceilings; and, • industry-specific process changes in the range of 20 percent improvement.

  40. Ramp Rate Constraints Year-over-Year Change in Conservation Acquisitions Are Not Limiting

  41. Why the 1983 “Achievable Potential” Forecast Was Important • In 1983 lead times for construction of new generation (coal & nuclear) were 12-15 years • Average resource size ~ 1000 MW • Therefore, if conservation resources were to offset the construction of new generation the Council needed to forecast “achievable savings” 12-15 years out • Even if successful, “options” would only defer construction lead time by 5-7 years

  42. Why It’s Less Important Today • Lead time for new generating resources is 2-5 years • Average resource size ~ 250 – 350 MW • Ability to expedite (or delay) construction now greater • Issue is “near-term” ramp rate, rather than long term “maximum achievable”

  43. Lack of Sustained Acquisition Program Activity Precludes Direct Comparison With 1983 Plan Forecast of Achievable Potential

  44. End