An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WASHINGTON DEPARTMENT OF FISH & WILDLIFE FISH PASSAGE AND FISH SCREENING STATUS - 2006

  2. WDFW FISH PASSAGE/FISH SCREENING PRIORITIES • FISH PASSAGE AND SCREENING TECHNICAL ASSISTANCE • PASSAGE AND SCREENING CORRECTION ON AGENCY LANDS • FISH PASSAGE AND SCREENING INVENTORIES • FACILITATE COMPLIANCE CORRECTIONS AT NON-AGENCY FISH SCREENS

  3. KEY INITIATIVES • Correction of passage and screening problems on WDFW lands • Forest and Fish Agreement – “passage of all species and life stages” (by 2016) • Aggressive WSDOT fish passage efforts • FRIMA/SRFB/etc. grant programs • Project partnerships with BOR, Conservation Districts, etc.

  4. Inventories • WDFW lands inventory • Inventory complete in WWA; ~25% complete in EWA • 58 road-related barriers and 93 non-road barriers identified to date • WSDOT inventory • 3,112 state highway stream crossings inventoried through March 2006 • 1,136 barriers with significant habitat gain identified through March 2006 • FRIMA comprehensive watershed inventory • Third party inventories

  5. Screen/Fishway Inspection/Maintenance • Mitchell Act • Inspect/maintain 15 fish screens and 46 fishways • BPA • Inspect/maintain 28 fish screens • State screen inspection • Inspect ~150 third-party fish screens • Fishway inspections • WSDOT – Inspect 152 WSDOT-owned fishways • WDFW – Inspect/maintain 64 agency-owned fishways • No longer have funding to inspect the additional ~400 third party fishways

  6. YAKIMA CONSTRUCTION SHOP (YCS) ACCOMPLISHMENTS • Western WA • Clallam Cline Diversion - intake and screen renovation • Elwha Hatchery - water intake screen renovation • Naselle Hatchery - water intake screen renovation • Shillapoo WA - renovation of plate screen seals • Independent Diversion - intake and screen renovation (2007) • Sequim Prairie Diversion - intake and screen renovation (2007) • Canyon Creek - fish passage at hatchery water intake (design completed)

  7. YCS ACCOMPLISHMENTS(cont.) • North Central WA • Wells WA - replacement of 4 pump screens and pumps • Methow Valley E/W Diversions - reconstruction of drum screen facilities and passage (BOR project) • McDevitt Diversion - replacement of screen with modular drum screen • Hottell Diversion - replacement of screen with modular drum screen • Jones/Shotwell - fabrication of new plate wiper screen (large) • Aspen Meadows – screen replacement with modular plate screen

  8. YCS ACCOMPLISHMENTS(cont.) • Yakima Basin • Fogarty Diversion – Phase 2 drum (large) screen replacement • Lesh Diversion – installation of new portable modular drum screen • Diversion 14 – new drum screen • Shaw Knox Diversion – Installation of new portable modular drum screen • Shaw Knox Side Channel – prefab of concrete weir/pool fishway • Garretson Diversion – installation of new plate screen

  9. YCS ACCOMPLISHMENTS(cont.) • SW WA • Tucannon Hatchery – installation of outfall barrier screen • Ringold Hatchery – installation of outfall barrier screen • Bergevin Williams/Old Lowden – refurbish drum screens • Touchet Consolidation - ~$2M future project (design completed)

  10. YCS ACCOMPLISHMENTS(cont.) • Contract/Non-Screen Projects • Swofford Ponds – fabricate new large drum screens for Tacoma Power • Toppenish Wildlife Refuge – fabrication of 2 belt screens and 1 paddle wheel driven belt screen • Fabrication of hatchery pickets • Radon reduction towers – Spokane Hatchery • Installation of crop damage fencing • Hatchery crowder screens (Lyons Ferry)

  11. TECHNICALASSISTANCE • Guidance Development • Training • Regional and Statewide TA • Site or Project Specific TA – 400+/year • Project Management • Funding Assistance

  12. ANNUAL FUNDING($1,000s) Inventory/Project Scoping $1,575 Mitchell Act 200 BPA O&M 150 State Screen Inspection 100 Fish Passage TA 200 Fish Screen TA 90 Fish Passage Capital 1,000 Fish Screen Capital 270 Total $3,585