1 / 23

Slide Jack Tuner

Detailed performance test results of the Slide-Jack Tuner System conducted during a meeting at IHEP Beijing in December 2011. The system configuration, force boosters, drive components, roller wedge, bearing holder, and overall functionality.

lucindap
Download Presentation

Slide Jack Tuner

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Slide Jack Tuner TTC Meeting at IHEP Beijin, 2011.12.7

  2. Performance Test Resultsof Slide-Jack Tuner Systemin S1-G TTC Meeting at IHEP Beijin, 2011.12.7

  3. Common Configuration of Tuners 3000N/mm Need Force Boosters 1 2 3 Piezo Booster Drive (Motor) Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 3

  4. Slide Jack TunerRoller Wedge & Screw Bearing Holder Caterpillar Roller Titanium Flange Taper Screw Flat Base Plate Titanium Flange of Helium Vessel TTC Meeting at IHEP Beijin, 2011.12.7

  5. Slide Jack Tuner 290N/mm Drive Shaft Invar Rod Piezo Stack Roller Taper Pin x 4 for Alignment +-200mm, 2mrad. TTC Meeting at IHEP Beijin, 2011.12.7

  6. STF BL Module 2K He line Support base Invar Rod a Cavity covered with Ti Jacket Titanium Jacket Motor drive shaft Pulse motor (outside) Slide Jack Tuner Nb/Ti Flange Piezo element TTC Meeting at IHEP Beijin, 2011.12.7

  7. Stroke of Mechanical Tuner Cryomodule - C Cryomodule - A 1300.00MHz 1300.00MHz 1299.95MHz 1299.92MHz Trouble of two mechanical tuners occurred in C2/ACC011 (Blade) and A4/MHI-09 (Slide-Jack/end) !! Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 7

  8. Slide Jack TunerRoller Wedge & Screw Bearing Holder Caterpillar Roller Titanium Flange Taper Flat Base Plate Titanium Flange of Helium Vessel TTC Meeting at IHEP Beijin, 2011.12.7

  9. Two Dominant Mechanical ModesSingle – Cell F(H2) ~ + Need Stiff Jacket-Tuner System Need Stiff Cavity F(E2) Fundamental mode 2-nd order mode ~200Hz ~2500Hz Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 9

  10. Lorentz Deformation Oscillation Amplitude (Xk) ~200Hz Offset Compensation ~2500Hz Stationary Amplitude Piezo Compensation Eacc Time 1.5 msec. Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 10

  11. Stiffness of the Slide Jack Tuner System KCavity 3 N / mm KJacket KTuner 95 N / mm 290 N / mm KS = 72 N / mm TTC Meeting at IHEP Beijin, 2011.12.7

  12. Lorentz ( Maxwell ) Detuning Kjacket Ktuner 135 N Fr Kcavity @ Eacc = 35MV/m FZ FZ 42 N Fz Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 12

  13. Single Pulse Response (Cryo-A + Cryo-C) Normalized KEK Slide-Jack tuner 1 piezo (0.2mF) FNAL Blade tuner 2 piezo (4mF) DESY Saclay tuner 1 piezo (2mF) Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 13

  14. Compensation of Lorentz detuning in S-1 G A2/MHI-06 (Slide Jack) 38 MV/m A2/MHI-06 38 MV/m drive f = 200Hz drive V = 400V dc V = 140V FB/on, Piezo/off FB/on, Piezo/on D f at rise time ~ 700Hz pre-det. ~ 600Hz drive f = 315Hz drive V = 400V dc V = 100V drive f = 300Hz drive V = 400V dc V = 35V D f ~ 200Hz D f < ±20Hz drive f = 400Hz drive V = 300V dc V = 120V Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 14

  15. Compensation of Lorentz detuning in S1-G C4/Z109 29 MV/m C4/Z109 (Saclay Tuner) 29 MV/m drive f = 200Hz drive V = 130V dc V = 4V FB/on, Piezo/off FB/on, Piezo/on D f at rise time ~ 400Hz pre-det. ~ 180Hz drive f = 250Hz drive V = 120V dc V = 5V drive f = 300Hz drive V = 106V dc V = 16V D f ~ 500Hz D f < ±20Hz drive f = 400Hz drive V = 94V dc V = 43V Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 15

  16. Summary of Lorentz Detuning Df = k(Eacc)2 Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 16

  17. TTC Meeting at IHEP Beijin, 2011.12.7

  18. Stroke of Piezo Tuner (Cryo-A) 50W RF Amp. + PLL (Vpiezo = 0 ~ +500V, HV Type 1000V Max.) A1; MHI-05 KEK A2; MHI-06 KEK 50Hz/div 50Hz/div 350Hz 200Hz A3; MHI-07 KEK A4; MHI-09 KEK 50Hz/div 100Hz/div 200Hz 450Hz Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 18

  19. Stroke of Piezo Tuner (Cryo-C) 50W RF Amp. + PLL (Vpiezo = 0 ~ +200V, LV Type 200V Max.) C1; AES004 FNAL Breakdown at 110V C2; ACC011 FNAL 500Hz/div 200Hz/div 2400Hz 600Hz C4; Z109 DESY C3; Z108 DESY 200Hz/div 200Hz/div 1000Hz 800Hz Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 19

  20. Special Features • Robust & Stiff • Outside Motor • Commercial Components • Piezo Replaceable TTC Meeting at IHEP Beijin, 2011.12.7

  21. The ILC Blade Tuner On the basis of the test results here presented the ILC Blade Tuner prototype is already close to fulfill all the XFEL and ILC specifications. The experience gained with the cold tests on the so called 3.0.0 prototype has been used for the final revision of the Blade Tuner, currently under construction. The first 8 units for Fermilab have been produced and 2 more are under construction. Double Piezo Shuichi Noguchi, KEK TTC Meeting at IHEP Beijin, 2011.12.7 21

  22. Components TTC Meeting at IHEP Beijin, 2011.12.7

  23. Jacket Stiffness 18 t 6 t 30 t 30 t 18 t KEnd-plate KCylinder KFlange KFlange KEnd-plate 427 N / mm 680 N / mm 494 N / mm 404 N / mm 455 N / mm 214 N / mm 263 N / mm 286 N / mm 95 N / mm TTC Meeting at IHEP Beijin, 2011.12.7

More Related