1 / 72

Detection and Measurement of Pavement Cracking

Detection and Measurement of Pavement Cracking . Bagas Prama Ananta. Overview. Background Aims The Proposed Method Tests and Results Conclusion Future Work. Background. Roads are a major asset in most countries To manage these assets, road authorities need:

lucita
Download Presentation

Detection and Measurement of Pavement Cracking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detection and Measurement of Pavement Cracking Bagas Prama Ananta

  2. Overview • Background • Aims • The Proposed Method • Tests and Results • Conclusion • Future Work

  3. Background • Roads are a major asset in most countries • To manage these assets, road authorities need: • Accurate, up-to-date information on the condition of their road network • Information on defects is vital to keeping a well maintain road network

  4. Why do we do a Road Maintenance? • Early detection of defects in road surfaces helps: • maintenance to be performed before defects develop into more serious problems, such as potholes and pop-outs. • Thus, detection and measurement of pavement cracking: • Provide valuable information on the condition of a road network • Reduce maintenance cost • Create a better road network for people to use

  5. Types of Cracks Transverse Cracking

  6. Types of Cracks… Longitudinal Cracking

  7. Types of Cracks Crocodile Cracking

  8. Background… • The 1st maintenance process is the detection of defects • Once detected, defects can be analysed and a decision can be made as to what action needs to be taken

  9. Present Method • Visual inspection • Two operators travel at 20 km/h • One as the driver, another to record the defect • Time consuming, costly and can be dangerous

  10. Present Method… • An improved method • A video based system • Able to record the pavement up to 100 km/h • The recorded video is then inspected off-line at speed of 20 km/h

  11. Present Method…

  12. Project Aims • Proposing a method of semi-automated detection of cracking defects in the road pavement from video footage. • Advantages of a semi-automated system: • Faster • More reliable • More accurate

  13. Challenges • Low resolution of the captured image • 768x576 pixels or 0.44 megapixels • Lossy compression is used • To make storage of the data practical • Highly variable lightning conditions • Potential false identification of cracks • Shadows, rail and tram tracks, other road objects

  14. Challenges • Sample set provided by PureData, however the images were not suitable for testing. • Resolutions are too low • Most images are not sharp (i.e. a lot of blurry images) which result in noises • 1200x900 (~1mp) images are used to test the method

  15. Commercial Implementation • Several companies offer solutions for monitoring road surface condition • Such solution are the CSIRO and Roadware crack detection systems • Due to the commercial nature, information on their operation is limited

  16. CSIRO’s Road Crack Detection Vehicle • Comprised of mostly custom designed and manufactured hardware • The system is very expensive and requires specialised maintenance

  17. CSIRO’s Road Crack Detection • Performs all data analysis in the field • No image data is kept • The only output is the road quality report • Leads to uncertainty with the accuracy of the results • Further manual inspection is needed to guarantee the results of the systems

  18. Roadware’s Wisecrax • Performs all data analysis off-line • Dual video cameras record 1.5 m by 4 m sections of pavement • High intensity strobe lights produce consistent illumination of pavement images

  19. Solution to Similar Problems • Crack Detection by the use of a laser based system • Work on this problem was commenced by a previous honours student (Timothy Evans). • A modified watershed algorithm was proposed • Difficulty in testing his algorithm • This project uses part of Tim’s method for detecting cracks • Sun et. al [2] proposed a new segmentation algorithm for detecting tiny objects • Edge detection, line growing and line cutting • Crack detection based on the “grid-cell” analsyis by Xu and Huang

  20. The Proposed Method • To use image processing techniques to segment the cracking information. • Seed Selection • Line growing • Noise removal

  21. Pipeline of Solution

  22. Initial Detection or Seeding • Horizontal and Vertical Scan • Contrast Comparison • Combine seed

  23. Profiles of Cracks, Lane Marks and Shadows • The challenge in crack detection is to differentiate between cracks and noises, where noises are: • Stone texture • Leaves, branches, etc • Lane Markings • Shadows • Analysing the different between the profiles between cracks and noise (lane marks and shadows) is useful for segmenting the crack from images.

  24. A Lane Mark profile

  25. A Shadow Profile

  26. A Crack Profile

  27. Cracks on Shadows Cracks Cracks on shadows

  28. Seed Selection - Horizontal and Vertical Scan

  29. Original Image

  30. Horizontal and Vertical Pass

  31. Seed Selection – Contrast Comparison • A represents the current pixel. B and C are the candidate pixel for growing. • Calculate all the 4 directions: R=max(R(a), R(b), R(c), and R(d)). • If R > T, then the seed is validated else seed is discarded

  32. Original Image

  33. Contrast Selection

  34. Seed Selection - Combination • The proposed method of seed selection • The combination of Horizontal & Vertical and Contrast comparison • More accurate

  35. Original Image

  36. Horizontal and Vertical Pass & contrast Selection

  37. Line Growing – Watershed transformation current pixel • Start from the current pixel • Mark pixels that are similar to the current pixel as a potential crack seed

  38. Original Image

  39. Watershed Transformation / Line Growing Algorithm

  40. Noise Removal • Flooded points must not be too close with each other to the extent the area is overcrowded • A crack will generally have a certain width • A crack will generally not be an isolated pixel

  41. Original Image

  42. Noise Removal – Over Crowded

  43. Original Image

  44. Noise Removal – Isolated Pixels and Crack Width

  45. Original Image

  46. Horizontal and Vertical Pass

  47. Contrast Selection

  48. Horizontal and Vertical Pass & contrast Selection

  49. Watershed Transformation / Line Growing Algorithm

  50. Noise Removal – Over flooding

More Related