1 / 4

Validation and Dedicated RAOB Status

Validation and Dedicated RAOB Status. N. R. Nalli, T. Reale , D. Tobin, L. Borg, A. Gambacorta , E. Maddy , B. Sun, E. Joseph, A. Mollner , B. Demoz , M. Divakarla , C. Tan, F. Iturbide-Sanchez, X. Xiong , T. King, D. Wolfe, M. Oyola , et al.

lucius
Download Presentation

Validation and Dedicated RAOB Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Validation and Dedicated RAOB Status N. R. Nalli, T. Reale, D. Tobin, L. Borg, A. Gambacorta, E. Maddy, B. Sun, E. Joseph, A. Mollner, B. Demoz, M. Divakarla, C. Tan, F. Iturbide-Sanchez, X. Xiong, T. King, D. Wolfe, M. Oyola, et al. CrIMSS EDR Validation Telecon 13 August 2013

  2. ICV Coordinated Dedicated RAOB Campaign Year 1* *2012 Funded/Planned RAOBs – the planned 2012 AEROSE campaign was postponed to 2013, so included here

  3. ICV Coordinated Dedicated RAOB Campaign Year 2* *2013 Funded and/or Planned RAOBs as of 16-Jul-13

  4. Validation Using Dedicated RAOBs • Obtaining and tabulating overpass/launch information for Year-2 Dedicated RAOBs currently being launched at ARM sites • Plan to update on a bi-weekly to monthly basis • There has been a hiatus the past couple weeks for reassessments • Will strive to spread out launches over a period longer than 6 months • Will strive for uniform 5 m/s balloon ascents as per Vaisala recommendation • Launch schedules have recently been updated and launches have just resumed • Obtaining matchup granule “stamps” • IDPS SDRs, TDRs, CCRs, EDRs • Looking into including VIIRS stamps (for potential future cloud work) • RAOB data degraded to 100 effective RTA layer • Working with Frank Tilley on NPROVS-side • Performing initial QA on matchups • SDR/TDR “stamps” to be used for re-retrievals based on CrIMSS OE, NUCAPS • CrIS Dual-Regression algorithm retrievals

More Related