1 / 4

Stages & Planning in Standardisation

Stages & Planning in Standardisation. A short overview. Stages in Standardisation. Preliminary stage Preliminary work item/ PWI, DC Proposal stage New work item proposal/ NP Preparatory stage Working draft/ WD Committee stage Committee draft/ CD Enquiry stage Enquiry draft/ CDV

lucky
Download Presentation

Stages & Planning in Standardisation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stages & Planningin Standardisation A short overview

  2. Stages in Standardisation • Preliminary stage Preliminary work item/PWI, DC • Proposal stage New work item proposal/NP • Preparatory stage Working draft/WD • Committee stage Committee draft/CD • Enquiry stage Enquiry draft/CDV • Approval stage final draft International Standard/FDIS • Publication stage International Standard/IS

  3. Planning in Standardisation • The following time limits may be used as guidance when establishing target dates, following approval of the work item: • availability of working draft (if not supplied with the proposal): 6 months • availability of committee draft: 12 months • availability of enquiry draft: 24 months • availability of approval draft: 33 months • availability of published standard: 36 months

  4. Short overview Cumulative time span from SMB approval of NP till IS Not defined 0 months 6 months 12 months 24 months 33 months 36 months PWI/DC NP WD CD CDV FDIS IS

More Related