100 likes | 191 Views
DATA ELEMENT UPDATE. Gary R. Horn Facilities Engineer, LEED AP Office of Engineering & Construction Management June 14, 2011. FRPP – Proposed Changes. Received from OMB May 31 with comments due June 10 Proposed 10 new data elements and minor changes to three existing elements
E N D
DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering & Construction Management June 14, 2011
FRPP – Proposed Changes • Received from OMB May 31 with comments due June 10 • Proposed 10 new data elements and minor changes to three existing elements • Provided to Programs for comment • DOE Response • FRPP was created as an information system, not a management system • Questioned the cost/benefit of data • Questioned the requested level of granularity • Stand by – more to come 2
Proposed New Elements • Total Annual BTU Consumption • Total Number of Contractors • Total Number of Federal Personnel • Total Number of Federal Personnel Teleworking • Planned Disposition • Yes/No • Anticipated Date • Planned Disposition Method • Yes/No • Anticipated Method 3
Proposed New Elements • Planned Excess • Yes/No • Anticipated Date • Candidate for Sale • Yes/No • Anticipated Date • Lease Cost • Annual Rent to Lessor • Annual O&M Cost • Lease Identifier • Lease Expiration Date • Lease Termination Right Date 4
Proposed Changes to Existing Elements • Utilization • Disposition • Sustainability 5
FIMS Data Element Review • Top to Bottom Review of All Data Elements • Headquarters Review Complete • Elements Already Removed (9) • Modernization Planning Indicator • No. of Buildings/Trailers • No. of Employees (Duplicative – Total Number of Occupants) • Occupant ID • Occupant Indicator • Occupant Name • Occupant Type • Regulatory Basis • Rehab and Improvement Cost • Approximately 40 Additional Elements Proposed For Removal 6
FIMS Data Element Review • Data Elements Proposed for Elimination • Acquisition Date From (Land) • Acquisition Date To (Land) • Need single acquisition date for all property types. Subsequent acquisition (i.e. another parcel) would be a new record • Annual Rent – Lab • Annual Rent – Office • Annual Rent – Other • Need to add Rentable SF • Annual Required Maintenance • Area Name • Congressional District (1-10) (Duplicated at Asset Level) • Excess Year (Estimated Disposition Year is used) • Geographic Location – City Code • Geographic Location – County Code • Grantee Cancellation Rights • Grantee Cancellation Rights – Days • Grantor Cancellation Rights • Grantor Cancellation Rights – Days • Grantor City • Grantor Mailing Address • Grantor State 7
FIMS Data Element Review • Data Elements Proposed for Elimination • Grantor Zip Code • Net Usable SF • No. of Employees (Duplicative – Total Number of Occupants) • Number of floors below grade • Outgrant Other • Renewal Options • Renewal Options – Additional Years • Renewal Options – Days Notice • Renewal Rent Next • Reporting Source • Responsible Party – Electric • Responsible Party - Janitorial • Responsible Party – Refuse • Responsible Party – Sewage • Responsible Party – Utilities • Retain Responsible Party Exterior and Responsible Party Interior • Site Address • Site City • Site State 8
FIMS Data Element Review • Data Elements Proposed for Elimination • Structured – Inside Parking (GSA Space) • Summary/Detail Indicator • Surface – Outside Parking (GSA Space) • No. of Employees (Duplicative – Total Number of Occupants) • OECM will prepare Request(s) for Changes and submit to the FAC for deliberation and then to the FDDC for decision • We will take a snapshot of the database prior to removing elements approved for deletion 9
Questions ? Gary Horn 202.586.9296 Gary.horn@hq.doe.gov 10