200 likes | 395 Views
Facilities & Planning. Millar Library Learning Grounds. Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations. 2011-12 Current Construction Areas. University Point. College Station Housing
E N D
Facilities & Planning Millar Library Learning Grounds Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations
2011-12 Current Construction Areas
University Point • College Station Housing • A PSU project with American Campus Communities (ACC) to increase student residential facilities at PSU • Walsh Construction, Contractor • 368,612 GSF, 16 Floors, 978 Beds • Building to have student housing, three general pool classrooms, a lecture hall, ground floor retail • Construction is anticipated to start in early December 2010 and continue through Summer of 2012 • Sidewalks and parking adjacent to the property will be closed throughout the project. Max Green Line service continues • PSU Project Rep: Jennifer Sharp
Life Science Collaborative Building OUS/OHSU Life Science Collaborative Building at South Waterfront • Located at OHSU Schnitzer Campus • New building anticipated to collaboratively house OHSU, PSU, OSU, and private partners • 12-story – approx 650,000 GSF • (Includes OHSU’s new spaces in Phases I & 2, Skourtes Tower) • Building program is in refinement and includes: part of PSU Chemistry & Biology program, life sciences education & research, ground floor retail, & parking • Design process continuing • Estimated construction starting October 2011 • PSU occupancy September 2013 • Overall completion winter 2014 • PSU Project representative, Kate Vance • Current tracking LEED Gold, potentially achieving LEED Platinum
Lincoln Hall Seismic and Systems Upgrade • State Deferred Maintenance $29.2 million • Main part of project completed in late August 2010. Building re-opened for use for Fall Term 2010 with Fine & Performing Arts and General Pool classrooms re-opened • New Broadway Entry construction began late Spring 2011, with completion scheduled for Fall 2011 • Installation of Photovoltaic panels began late Spring 2011, with completion & start-up scheduled for fall 2011 • PSU Project Manager, Joanna Evenson
Science Research & Teaching Center & Hazardous Waste Facility (SRTC) ● Formerly Science Building 2 ● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. State Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and bonds. $26.3 Deferred Maintenance infrastructure project completed last winter term. ● $2 Million CLEE research labs completed this summer. ● $2 Million EDA Grant to replace or add 71 fume hoods completed. ● $600,000 lobby upgrade completed. Construction was partially funded by student fees. ● Hoffman Construction will demobilize and be offsite starting Jan 2012. ● PSU Project Manager, Mark Fujii.
Campus Steam & Chilled Water Loop ● Oregon Economic Stimulus Funded Project $17.5 million ● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop ● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings . Estimated energy savings over $300,000 per year ● Geothermal cooling of a new heat pump and chiller in SB2 ● Federal Grant of $1 M awarded to use more of the heat in the geothermal wells ● Completion of project Fall 2011 ● PSU Project Manager, Mark Fujii
Millar Library Learning Grounds ● Overall construction budget $614,000. ● Renovation of the Computer Lab ● Newly remodeled space, updated finishes, new computer workstations with integrated cable management. ● New "Sandbox Area" is a multi-use area defined by an innovative partition system, where students will have casual, impromptu work configurations while exploring integrated multi-media technology. ● Projected project completion Nov 15th ● PSU Project Managers: Francis McBride & Tracy Prose.
Joseph C. Blumel Hall Repipe Remodel • $7M Blumel Hall Remodel is funded by Article XI-F bonds to upgrade the building infrastructure. Bonds will be issued in Spring 2012. • Early funding is being considered to expedite the design and construction process. PSU Auxiliaries wishes the construction to begin Fall 2012 and complete by Summer 2013. • The upgrade will include replacing the roof, fixing the problem of water leaks in the units, and installing better heating controls and energy efficient lighting in the rooms • Modernization of the rooms will be considered if funds are available. This may include kitchen cabinets, appliances, counter, flooring and painting. • PSU Project Manager: Mark Fujii; PSU In-House Architect: Tom Arnich; PSU In-House Mech. Engineer: Quinn Soifer.
Potential Projects? • If you have a potential remodeling project in your plans contact our team and we will: • schedule a brief meeting to discuss scope • verify if project is feasible, or work with you to make it feasible • determine best delivery system – PSU crews or outside contractor, or consultant • manage design, permitting and estimating • oversee construction and completion of the project Francis McBride Construction Project Manager 503-725-8944 mcbridef@pdx.edu Ron Blaj Assistant Director Capital Project Management 503-725-4308 rblaj@pdx.edu
Facilities & Planning - Reception 503-725-3738 Questions? Francis Mcbride mcbridef@pdx.edu Mark Fujii: fujiim@pdx.edu Ernest Tipton: tiptone@pdx.edu Ron Blaj: rblaj@pdx.edu Kate Vance kvance@pdx.edu Jennifer Sharpsharpj@pdx.edu Kay Byrne byrnek@pdx.edu Quinn Soifersoiferq@pdx.edu our website www.fap.pdx.edu
Our Role: Help employees to work safely. Help supervisors provide employees with the information, skills, & tools they need to work safely Help administration to provide a safe workplace Help maintain compliance with environmental health & safety regulations (DEQ, OSHA and others) Environmental Health & Safety
Requesting Service from EH&S: Chemical Spill Emergency: 5-4404 (CPSO) Odor Reports: Call Facilities at 5-3738 Please submit a Work Order for all other service requests, including: - Ergonomic Assessments - Hazardous Waste Pick-Up http://www.fap.pdx.edu/workorder Environmental Health & Safety
Announcing our New Environmental Health and Safety Manager: Heather Randol (503) 725-9948 hrandol@pdx.edu Environmental Health and Safety
Environmental Health & SafetyFire Marshal Inspections • All buildings are on an inspection schedule • FAP will notify building occupants • Re-inspections if violations are found • Departments notified of any violations • If corrected in 40 days: No charge • If not corrected in 40 days: $$$ fees will be charged to the occupant’s department
Environmental Health & SafetyCommon Fire Code Violations • Unsafe chemical storage • Blocked exits • Materials stored in corridors
Environmental Health & SafetyCommon Fire Code Violations • Extension cords used instead of permanent wiring • Ganged surge protectors
Environmental Health & SafetyCommon Fire Code Violations • If violations are found, don’t wait! • Contact FAP for assistance. • 503-725-2FIX or http://www.pdx.edu/fap/
Maintenance & Operations • Our team provides the following campus services: • Electrical • HVAC&R • Plumbing • Carpentry • Energy Management • Keys & Lockshop • Grounds Maintenance • Signs & Way Finding Michael McBride Electrician 725-6062 mmcbride@pdx.edu Rick Viaene Chief Building Engineer 503-725-9996 viaene@pdx.edu Gerry Gadberry Assistant Director 503-725-9972 gadberry@pdx.edu Bob Folkerts Building Automation Supervisor 725-9981 rgf@pdx.edu
New telephone number: 725-2FIX (503-725-2349) FAP on the web: http://www.pdx.edu/fap Facilities Work Order System