1 / 14

Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks 20-25

Vessel Tracking Prototype for the UMR. Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks 20-25 Center For Transportation Studies University Of Missouri, St. Louis 15 June 2005. Vessel Tracking Prototype .

lupita
Download Presentation

Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks 20-25

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vessel Tracking Prototype for the UMR Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks 20-25 Center For Transportation Studies University Of Missouri, St. Louis 15 June 2005

  2. Vessel Tracking Prototype • Provides sample displays and vessel tracking to demonstrate the functionality possible. • Static views demonstrate geographic (map) and attribute (tabular) data display capabilities. • Dynamic views show tows moving on the UMR. • Software from ESRI: • ArcMap (ArcGIS) for geographic and attribute data. • Tracking Analyst extension for vessel movements.

  3. Scope of Prototype • Scope depends on selected scheduling system. • Could range from: • Local focus and span of control at a single lock (several miles upstream and downstream). • Regional or system focus incorporating multiple locks (up to ~100 miles).

  4. Locks 20-25

  5. Pool 22

  6. Lock 22

  7. Photos

  8. Lock, Queue & Pool Data Information on locks, queues and pools is available from menus or icons on the map.

  9. Lock Data Information may be static or dynamic.

  10. Pool Data 6 tows in Pool 22 1 Up Bound 5 Down Bound (3 in Queue)

  11. Queue Data 6 tows in Queue 22 3 Up Bound 3 Down Bound

  12. Locking Sequence Sequence includes 6 tows in queue + 2 tows Down Bound in Pool 22.

  13. Locking Sequence Current Time 4/11/05 11:30:10 Dir Total Lock Vessel # of Vessel Name Vessel# Date Time ETSOL U/D Barges Type Type Cuts Lock Sequence 22 JOHNNY LATER 521667 SOL 04-11-05 10:30 CDT U 12 S T 2 1. RIVER RAT 883452 ARR 04-11-05 10:45 CDT 04-11-05 12:40 CDT U 1 S T 1 2. RIVER SPECIAL 233951 ARR 04-11-05 8:00 CDT 04-11-05 13:15 CDT U 15 S T 2 3. MEMCO #1312 653122 EOL 04-11-05 7:30 CDT 04-11-05 15:15 CDT D 8 S T 1 4. EA POE IRON CO 252338 ARR 04-11-05 9:00 CDT 04-11-05 16:00 CDT D 15 S T 2 5. GO JOHNNY 978192 ARR 04-11-05 10:15 CDT 04-11-05 18:00 CDT U 15 S T 2 6. BRUCE HAHN 167448 ARR 04-11-05 10:30 CDT 04-11-05 20:00 CDT D 15 S T 2 7. EASY SAILOR 575543 ARR 04-11-05 11:00 CDT 04-11-05 22:00 CDT D 15 S T 2 8. FERMI’S #2 145763 EOL 04-11-05 8:30 CDT 04-11-05 24:00 CDT D 15 S T 2

  14. Locking Sequence Resequencing FCFS FCFS Vessel Name Wait Wait Seq. Savings 1. RIVER RAT 1:55 9:55 5 + 8:00 2. RIVER SPECIAL 5:15 4:40 1 - 0:35 3. MEMCO #1312 1:45 9:45 7 + 8:00 4. EA POE IRON CO 7:00 5:40 2 - 1:20 5. GO JOHNNY 7:45 6:25 3 - 1:20 6. BRUCE HAHN 9:30 8:10 4 - 1:20 7. EASY SAILOR 11:00 10:15 6 - 0:45 8. FERMI’S #2 9:30 9:30 8 0:00 TOTAL 53:40 64:20 10:40 Net savings = 10 hours 40 minutes

More Related