Region Perspective for Bridge Work

Region Perspective for Bridge Work. Tim Potter: Region 2 Manager of Bridge/Geo/Hydro unit Other Regions: Region 1:Tony Stratis Manager of Bridge Region 3:James Burford Manager of Bridge/Roadway Region 4: Randy Davis Manager of Bridge/Geo/Environmental

lydia
Download Presentation

Region Perspective for Bridge Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Region Perspective for Bridge Work Tim Potter: Region 2 Manager of Bridge/Geo/Hydro unit Other Regions: • Region 1:Tony Stratis Manager of Bridge • Region 3:James Burford Manager of Bridge/Roadway • Region 4: Randy Davis Manager of Bridge/Geo/Environmental • Region 5: Mark Hanson Manager of Bridge/Geo/Environmental

  2. Contracting for Work with ODOT Regions • Since the Reorganization, each Region has a separate Tech Center that determines the work that will be contracted. • Due to the needs of each Region, the organization of each Tech Center is unique to that Region

  3. Contracting for Work with ODOT Regions (STIP) • Each region determines the need and timing of contracting services • Contact is made with the Office of Procurement to determine next available Discipline Specific consultant • Contact is made between the Region Contract administrator and the consultant, negotiations begin

  4. Contracting for Work with ODOT Regions (STIP) • Each Region will independently negotiate the Scope of Work and the resulting hours (effort) needed to complete the contract. • Each Region will independently review the work products at the predetermined milestones. • The milestones and deliverables will be based on the “PD-02” schedule

  5. Contracting for Work with ODOT Regions (STIP) • Within Region 2, STIP work will either be contracted: • as entire projects, with a Consultant Project Manager (CPM) acting as oversight, or: • As specific discipline work, with a member of that discipline team as the contract administrator. In the case of Region 2, that will be Al Heyn (503-986-2774)

  6. Contracting for Work with ODOT Regions (STIP) • Other Region Contacts • Region 1 Nowzar Ardalan (503-731-4964) • Region 2 Al Heyn (503-986-2774) • Region 3 Bob Grubbs (541-957-3579) • Region 4 Jay Davenport (541-388-6383) • Region 5 Mark Hanson (541-963-1361)

  7. Contracting for Work with ODOT Regions (STIP) Review Process • For Complete Projects, CPM will route original SOW to each discipline lead for input on SOW/Level of effort • Review will occur at major milestones (Pre-DAP,DAP, Advance Plans, Final Plans), again by discipline lead • Focus of review will be adherence to BDDM, and other specific Design needs

  8. Contracting for Work with ODOT Regions (STIP) Review Process • For Single Discipline Work Order, review will be coordinated by Contract Administrator (Region 2, Al Heyn for example) • Review will occur at major milestones (Pre-DAP,DAP, Advance Plans, Final Plans), by discipline lead • Same focus of review, but probably more intimate knowledge of the project will lead to more detailed review

  9. Contracting for Work with ODOT Regions (Local Agency)