1 / 5

Integration Requirements

Integration and Field Testing Matthew Baus Chief Engineer, Powertrain Systems International Truck and Engine Corporation Truck Technology and Development Center Fort Wayne, IN. Integration Requirements. Engine development traditionally “leads” vehicle integration

lyneth
Download Presentation

Integration Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration and Field TestingMatthew BausChief Engineer, Powertrain SystemsInternational Truck and Engine CorporationTruck Technology and Development CenterFort Wayne, IN

  2. Integration Requirements • Engine development traditionally “leads” vehicle integration • Concurrent development and validation • Definition of major installation impacts and solutions need to occur before “early” vehicles for field test ready • Customer field test plan as an integral component of production validation

  3. Field Test Requirements • Fuel availability • Field service support from OEM and engine manufacturer • Production intent hardware and installations • 18 months in service – customer need • Coverage of product lines

  4. Field Test Benefits • Operational • Maintenance • Early feedback to OEM and engine manufacturer • Customer confidence

More Related