NEBS & ETSI Vibration2U24 Black Boxw/ 2-Post Rack Mount Kit Brenden Rust Eddy Larson Charlie Morris 10/26/09
OBJECTIVE: Provide declaration of conformance to the NEBS & ETSI dynamic requirements for the 2U-24 Black Box RAID system & a newly designed 2 post rack mounting kit. • CONCLUSION • All test results were positive. There was no loss of functionality or significant performance degradation during or after exposure to the following vibration tests in any axis, X, Y, or Z. • NEBS earthquake, zone 4 • NEBS office vibration (swept sine) – 0.1g, 5-100Hz, two sweeps @ 0.1 oct/minute. • ETSI random vibration – 5-10 Hz +12dB/oct, 10-50Hz @ 0.02 m2/s3, 50-100Hz -12dB/oct • ETSI swept sine vibration – 5-62 Hz w/ velocity @ 5mm/s, 62-200Hz w/ accel @ 2m/sec2, 10 sweeps @ 1.0 octave/minute • SYSTEM CONFIGURATION UNDER TEST • Prototype “soft tooled” two post rack mount kit • 2U-24 Black Box RAID system • Mercury 4 port SAS controller (Provide model number; 2532?) • (2) 3Y AC power supplies • (24) Fujitsu disk drives • Model #MBD2300RC 300GB capacity • SAS interface • Firmware 0102 DHS Confidential
Test Setup • A 2U-24 RAID system configured as described earlier in this report was mounted in a rigid fixture to the applicable shaker table. The fixture provided a mounting configuration duplicating that of a 2 post rack conforming to EIA310E specifications. The rack kit can accommodate rack depths ranging from 3” to 7” and can be installed in either a front-mount or center-mount (CoG) configuration. For this testing, the rack mount’s depth was set at 3” and installed in a center mount configuration. Photo shows system installed on Z-axis shaker DHS Confidential
Test Setup • A triaxial accelerometer was mounted on the chassis immediately behind the left-hand mounting ear as shown below. The chassis responses shown on the curves within this report are all with the sensor in this position. Triaxial accelerometer DHS Confidential
Test Setup • IOMeter was used to monitor system performance during each test. I/O setting was 67/33% Read/Write with a block size of 4Kb. At both the start and end of the testing gauntlet a baseline was run with no induced vibration. The I/O degradation chart in this report compares I/O throughput during vibration to the initial baseline. Photo shows LH side, front mounting details DHS Confidential
Test Setup Photo shows LH side, rear mounting details DHS Confidential
Drive Degradation Note: This chart is for reference only. The tests performed do not specify degradation limits. Percentages shown are relative to the initial baseline Tests plotted in chronological order DHS Confidential
Reference Slides Follow DHS Confidential
X Axis, NEBS Quake DHS Confidential
Y Axis, NEBS Quake DHS Confidential
Z Axis, NEBS Quake DHS Confidential
X Axis, NEBS Office Vibe DHS Confidential
Y Axis, NEBS Office Vibe DHS Confidential
Z Axis, NEBS Office Vibe DHS Confidential
X Axis, ETSI Swept Sine DHS Confidential
Y Axis, ETSI Swept Sine DHS Confidential
Z Axis, ETSI Swept Sine DHS Confidential
X Axis, ETSI Random Vibe DHS Confidential
Y Axis, ETSI Random Vibe DHS Confidential
Z Axis, ETSI Random Vibe DHS Confidential