Leader Standard Work

Leader Standard Work. Lean Leadership Series. Topics. What is Leader Standard Work (LSW)? Why Leader Standard Work? Benefits of Leader Standard Work Four Elements of Lean Management Standard Work Examples Success Environment for LSW How to Deploy Leader Standard Work Key Points

macha
Download Presentation

Leader Standard Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Leader Standard Work Lean Leadership Series

  2. Topics What is Leader Standard Work (LSW)? Why Leader Standard Work? Benefits of Leader Standard Work Four Elements of Lean Management Standard Work Examples Success Environment for LSW How to Deploy Leader Standard Work Key Points Take Action

  3. A list of the normal tasks that must be done to sustain the lean management system Tasks typically include audits, meetings (daily accountability) and continuous improvement projects Focuses on the production process Directs the leader to check on the visual controls Expected to be continually improved Time each task should be completed (frequency) What is Leader Standard Work?

  4. Why Leader Standard Work? Clearly Documents the Management System Documents the current state of the best practices in lean management A baseline for further lean management system improvement Defines expected behavior for leaders (what they should do)

  5. Four Elements in the 12 Paradigms

  6. Who Should Have Standard Work? In Lean Management, EVERYONE!

  7. Standard Work Content • Standard Work Content Varies by Position • Standard work is LESS structured • % of time standard • Specific sequence • Specific time of day • More time for discretionary tasks • Standard work is MORE structured • % of time standard • Specific sequence • Specific time of day • Less time for discretionary Executive Value Stream Manager Supervisor and Supporting Roles (Engineering, Maintenance, Sales, Finance, Continuous Improvement, Purchasing) Team Leader Operator Production Process

  8. Layers of Standard Work Leaders standard work should be layered (developed) from the bottom up • Executives • Time on the floor to verify the chain of standard work is upheld and production process is stable and improving • Value Stream managers • Monitor and support supervisors in their ability to carry out their standard work • Supervisors • Monitor and support team leaders in their ability to carry out their standard work • Team Leaders • Maintain production and • ensure standard work is followed

  9. Daily Accountability Meetings Three Tiers Tier 1: Team Start Up Meeting Team leader meets briefly with team members Tier 2: Supervisor Meeting Supervisor meets with team leaders and dedicated support group representatives Tier 3: Value Stream Value Stream Manager with supervisors and support department personnel

  10. Key Points for LSW Check because You Care – each level of LSW has some overlap and redundancy to provide linkage – make sure they are logical and meaningful to you Learn by Doing – excellence is more about what you do than about what you know – and learning comes from action – follow the LSW process Improve the Standard – as the processes change and as people learn, Leader Standard Work needs to change with it

  11. Take Action Observe Leader Standard Work in action at the site Visit Model Line to learn how operator, TL and GL standard work is functioning What are the challenges? What are the benefits seen so far? Look for things that could be on your Leader Standard Work checks