Status of ELI Beamlines

Status of ELI Beamlines. Extreme Light Infrastructure (ELI) in brief. ELI will be the world ’ s first truly international laser research infrastructure , pursuing unique science and research applications for users

madelynd
Download Presentation

Status of ELI Beamlines

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of ELI Beamlines

  2. Extreme Light Infrastructure (ELI) in brief • ELI will be the world’s first truly international laser research infrastructure, pursuing unique science and research applications for users • ELI will be implemented as a distributed research infrastructurebased initially on 3 specialised and complementary facilities located in the Czech Republic, Hungary and Romania • ELI is the first ESFRI project to be fully implemented in the newer EU Member States • ELI is pioneering a novel funding model combining the use of structural funds(ERDF) for the implementation and contributions to an ERIC for operation

  3. New science, unique research opportunities • ELI will comprise 4 branches: • Attosecond Laser Science, which will capitalize on new regimes of time resolution(ELIALPS, Szeged, HU) • High-Energy Beam Facility, responsible for development and application of ultra-short pulses of high-energy particles and radiation stemming from relativistic and later ultrarelativistc interaction(ELIBeamlines, Prague, CZ) • Nuclear Physics Facility with ultra-intense lasers and brilliant gamma beams (up to 19 MeV) enabling also brilliant neutron beam generation with a largely controlled variety of energies (ELINP, Magurele, RO) • Ultra-High-Field Science centred on direct physics of the unprecedented laser field strength(ELI 4, to be decided)

  4. ELI Timeline

  5. ELI Beamlines facility Laser building 177,600 ft2 Laboratories 48,500 ft2 Offices 47,400 ft2 Multifunctionareas 25,000 ft2

  6. ELI Beamlines facility layout

  7. ELI Beamlines Lasers

  8. ELI Beamlines Lasers – L1, L3 • L1: Installed and partially commissioned. • L1: Beam transport to E1 being installed. • L3: HAPLS installed and fully commissioned • L3: Compressor installed and under commissioning. • L3: Beam transport designed and under deployment to E3.

  9. ELI Beamlines Lasers – L2, L4 • L2: Partially developed • L2: Installation works in L2 hall began • L4: Laser system developed in Texas • L4: Compressor under design. • L3: Will be delivered in 09/2018.

  10. E1 – X-Ray science, applications • HHG: Partially commissioned (L1 laser commissioning expected. • PXS: Commissioning done, multiple technical issues. • SRS: Commissioned with Femtolaser and used for user experiments. • End stations (MAC, TREX): Installed, partially commissioned and ready for real runs.

  11. E3 – Plasma Physics Platform • Installed, commissioning done for vacuum. • L3 Beam transport being installed. • First commissioning expected 12/2018.

  12. E4 – Ion and proton acceleration and medical applications • ELIMAIA: ELIMED (INFN) + ELI part. • Delivered and installed in E4. • Commissioning of vacuum and magnets done. • Commissioning with L3 expected in 2019.

  13. E5 – electron acceleration • LUIS – developed with DESY and University of Hamburg. • Tested on site in Hamburg. • Installation at ELI in 2019. • Potential for upgrade - FEL • HELL – developed in house. • Chambers delivered, optics to be installed. • Expected in 2019.

  14. Other systems • L3 Beam Transport – installation in E3 (towers, blocks) • L4 Beam Transport – design phase • Control System – Finalizing installations in E1, works on Beam Transport controls, installations in E4, central vacuum controls ready • Personal Safety Systems – two integrated systems (Laser Safety System for L1-L4, Personal Safety Interlock for E1-E5), LSS installed, PSI being designed • Monitoring System – SW is done and installed, detectors being purchased, gas monitors planned

  15. Acknowledgement • Supported by the project ELI - Extreme Light Infrastructure – phase 2 (CZ.02.1.01/0.0/0.0/15_008/0000162 ) from European Regional Development Fund.

  16. THANK YOU FOR YOUR ATTENTION!