90 likes | 226 Views
9/20/04 Page 2 . IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE. Working Group Members. Bill. BergmanStan Billings Anne Bosma Ted BursePete DwyerLeslie FalkinghamLarry FarrBill Long. Larry McCall Frank MuenchEd PetersHugh RossMel SmithDave Stone, Chair
E N D
1. 9/20/04 Page 1
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE PC 37.100.1Common Requirements Working Group Meeting
May 9, 2004
2. 9/20/04 Page 2
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Working Group Members Bill. Bergman
Stan Billings
Anne Bosma
Ted Burse
Pete Dwyer
Leslie Falkingham
Larry Farr
Bill Long Larry McCall
Frank Muench
Ed Peters
Hugh Ross
Mel Smith
Dave Stone, Chair
Alan Storms
Chuck Wagner
3. 9/20/04 Page 3
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Ballot Results July 26, 2004 March 28, 2005
Number in Ballot Group: 154 154
Affirmative 84 103
Negative 38 21
Abstention 4 7
Returns 126 82% 131 85%
Affirmative 84 69% 103 83%
Negative 38 31% 20 17%
122 123
4. 9/20/04 Page 4
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Ballot Comment Summary Received Review
Resolved Open
Editorial: 284 57% 244 40
General 5 1% 3 2
Unclassified 15 3% 12 3
Technical 198 39% 73 125
Total: 502 100% 332 170
5. 9/20/04 Page 5
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Guiding Principles for Std Include some tutorial material
Some concepts are new to the IEEE community.
More explanation would be beneficial
Place in main text, in footnotes, or in annex J
6. 9/20/04 Page 6
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Guiding Principles for Std Minimum Req’ts Vs. “Stretch” Req’ts
Standard should reflect the “common” requirements?
In some cases a “Stretch” goal?
-- Examples:
Solar radiation level 2.1.2.b)
Normal wind velocity 2.1.2.f)
7. 9/20/04 Page 7
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE Guiding Principles for Std Let’s not overload the ship with too much baggage on its maiden voyage.
8. 9/20/04 Page 8
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE 332 “Resolved” Comments The spreadsheet was sent out to all members of the WG on May 1.
Chairman asked WG to Agree or comment on the “resolutions” of this group of comments so we can move on.
9. 9/20/04 Page 9
IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE 170 “Open” Comments 45 topics were up for review
Most were reviewed, discuss and tentatively resolved at meeting
Some were remanded to the WG after some introduction