PC 37.100.1Common Requirements Working Group Meeting May 9, 2004 IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Bill. Bergman Stan Billings Anne Bosma Ted Burse Pete Dwyer Leslie Falkingham Larry Farr Bill Long Larry McCall Frank Muench Ed Peters Hugh Ross Mel Smith Dave Stone, Chair Alan Storms Chuck Wagner Working Group Members IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Ballot Results July 26, 2004 March 28, 2005 • Number in Ballot Group: 154 154 • Affirmative 84 103 • Negative 38 21 • Abstention 4 7 Returns 126 82% 131 85% • Affirmative 84 69% 103 83% • Negative3831% 20 17% • 122 123 IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Ballot Comment Summary ReceivedReview ResolvedOpen • Editorial: 284 57% 244 40 • General 5 1% 3 2 • Unclassified 15 3% 12 3 • Technical 19839% 73 125 • Total: 502 100% 332 170 IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Guiding Principles for Std Include some tutorial material • Some concepts are new to the IEEE community. • More explanation would be beneficial • Place in main text, in footnotes, or in annex J IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Guiding Principles for Std Minimum Req’ts Vs. “Stretch” Req’ts • Standard should reflect the “common” requirements? • In some cases a “Stretch” goal? -- Examples: • Solar radiation level 2.1.2.b) • Normal wind velocity 2.1.2.f) IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
Guiding Principles for Std Let’s not overload the ship with too much baggage on its maiden voyage. IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
332 “Resolved” Comments • The spreadsheet was sent out to all members of the WG on May 1. • Chairman asked WG to Agree or comment on the “resolutions” of this group of comments so we can move on. IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE
170 “Open” Comments • 45 topics were up for review • Most were reviewed, discuss and tentatively resolved at meeting • Some were remanded to the WG after some introduction IEEE POWER ENGINEERING SOCIETY / SWITCHGEAR COMMITTEE