180 likes | 294 Views
Analysis of Targeted Emission-Reduction Possibilities in the Paso del Norte (Ciudad Juárez ). Victor Valenzuela ( TCEQ ) Jose Mares ( UACJ ) Arturo Woocay ( ITCJ ) Wen-Whai Li ( UTEP ). Four Source Categories Cuatro Categorías de Fuentes. Fugitive PM emissions from unpaved roads
E N D
Analysis of Targeted Emission-Reduction Possibilities in the Paso del Norte (Ciudad Juárez) Victor Valenzuela (TCEQ) Jose Mares (UACJ) Arturo Woocay (ITCJ) Wen-Whai Li (UTEP)
Four Source CategoriesCuatro Categorías de Fuentes • Fugitive PM emissions from unpaved roads • Fugitive PM emissions from a cement plant • VOC emissions from gasoline fueling stations • VOC emissions from automotive paint and body shops • Emisiones fugitivas de PM relacionadas a caminos no pavimentados • Emisiones fugitivas de PM originadas en una planta cementera • Emisiones de compuestos orgánicos volátiles en estaciones de gasolina • Emisiones de compuestos orgánicos volátiles en talleres de pintura y reparación de automóviles
PM Emission form Unpaved Roads in Ciudad Juárez • Objetivo: • Desarrollar una estimación de la contribución de las emisiones de PM al media ambiente como resultado de el trafico vehicular en caminos no pavimentados de Cuidad Juárez y estimar el costo de pavimentarlos y mantenerlos. Objective: Develop an estimate of PM contributions to ambient air as a result of traffic on unpaved roads in Cuidad Juarez and estimate the cost of paving and maintaining such roads.
Tasks / Tareas • Desarrollar un inventario de emisiones de caminos no pavimentados de Cuidad Juárez. • Presentar gráficamente todos los caminos no pavimentados de Cuidad Juárez. • Determinar el contenido de carga de limo y humedad en los caminos no pavimentados. • Desarrolla estimaciones de las emisiones de los caminos no pavimentados • Desarrollar costos estimados para pavimentar y mantener los caminos actualmente sin pavimentar. • Develop an inventory of unpaved roads in Cuidad Juárez. • Graphically present all unpaved roads in CuidadJuárez. • Determine the silt loading content and soil moisture on unpaved roads. • Develop emission estimates for the unpaved roads. • Develop cost estimates for paving and maintaining the unpaved roads identified.
Unpaved Roads Inventory / Caminos No Pavimentados Source: Adapted from IMIP, 2012 and UACJ, 2012
Silt Loading Content and Soil Moisture / Carga de Limo y Contenido de Humedad • Soil sampling • 10 proposed soil sampling sites • 4 soil types • Alluvial • Sandstones • Conglomerate • Eolic Source: Adapted from IMIP, 2012 and UACJ, 2012
Soil Sampling Method /Método de Muestreo Unpaved roads • Use a 25x25 cm frame and collect loose material with a plastic scoop to a maximum depth of 2 cm. • Deposit the content into buckets sealed to preserve the moisture. • Collect >10% duplicate samples • Randomly selected sampling spots at a location using established procedures (using create random tool in ArcGIS)
Soil Sampling Method /Método de Muestreo (Cont) • Buckets, brooms and dustpans are to be marked with site number. • Disposable plastic gloves are to be worn to prevent contamination of the samples • Procedures described by US EPA AP-42 Compilation of air pollutant emission factors, Appendixes C-1 and C-2 are to be followed.
Emissions from Unpaved Roads • The emission factors will be estimated following the algorithm suggested in Chapter 13 Section 13.2.2 of the AP-42.
Wind Erosion • For estimating emissions from wind erosion of surfaces the following equation will be used.
Informationtobe Acquired / Información que se Necesita A complete transportation network that contains the following information. • Capacity of the roads • Average speed • Number of lanes • Origin-destination matrix • TransCAD output file if available La red de transporte completa que contenga la siguiente información. • Capacidad de las calles • Velocidad promedio • Numero de carriles • Matriz de origen-destino • Archivo de salida de TransCAD disponible
PM Emission from the Ciudad Juárez Cement Plant Objectives: Develop an estimate of emission from all PM generating processes at the combined quarry and rock-crushing facility and estimate possible reduction in PM emission considering operational modifications as control strategies. Objetivos: Desarrollar una estimación de las emisiones de PM debido a todos los procesos que las generen en las instalaciones de la cementera y estimar las posibles reducciones en emisiones de PM considerando estrategias de control como modificaciones operacionales
Tasks / Tareas • Documentar las operaciones de producción y procesado de las instalaciones. • Determinar el contenido de carga de limo y humedad en la cementera. • Desarrollar una estimación de las emisiones de la cementera. • Desarrollar medidas de control de emisiones de PM para las instalaciones. • Estimar la reducción en emisiones de PM debido a las estrategias de control. • Document the facility’s production and processing operations. • Determine the silt loading content and soil moisture at cement plant. • Develop emission estimates for the cement plant. • Develop PM emission control measures for the facility. • Estimate the reduction in PM emission due to control strategies.
Informationtobe Acquired / Información que se Necesita • Acquire production volumes. • Adquirir los volúmenes de producción.
Informationtobe Acquired / Información que se Necesita (Cont) • Develop inventory of activities considered to be sources of PM emissions, including: • (1) quarrying and crushing; (2) raw material preparation, handling and storage; (3) grinding and blending; (4) scalping/screening; (5) finish grinding; (6) washing/scrubbing; (7) packaging and loading; (8) onsite transportation on unpaved surface; and (9) dust emission control practices. • Desarrollar un inventario de actividades consideradas como fuentes emisoras de PM, incluyendo: • (1) extracción y molido; (2) preparación, manejo y almacenamiento de materia prima; (3) molido y mezclado; (4) colado/mallado; (5) pulido final; (6) lavado/tallado; (7) empaquetado y embarque; (8) transporte en sitio sobre calles no pavimentadas; y(9) practicas de control de emisión de polvo.
Informationtobe Acquired / Información que se Necesita (Cont) • The number, size, frequency, and route of each piece of equipment used in the all activities listed above need to be documented. • El numero, tamaño, frecuencia y ruta de cada pieza de equipo utilizada en todas las actividades anteriormente mencionadas, necesitan ser documentadas.
Informationtobe Acquired / Información que se Necesita (Cont)