An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSOM 4.3 – Standard Switching Terminology and Approved Abbreviations Midlands Area - Key Changes

  2. Introduction • Changes to the PSOM prompted by: • The introduction of Power on Fusion (PoF) as the CN Control System. • Differences between CIRAS and PoF. • The output of a working group set up to evaluate the smartest options going forward. • In addition and outside the PSOM some Switching device descriptions have been standardised within Power on Fusion.

  3. Principles Established (Underground) • The use Gas (GS), Oil(OS) Fault Making (FMS) to be replaced with Switch (SW). • The term Switch Fuse (SF) remains. • The use of Gas (GCB), Oil (OCB) Vacuum (VCB) to be replaced with Circuit Breaker (CB). • The terminology Open to OFF, Close to ON to be replaced with the instruction open or close followed by the consequence of the action i.e. to make parallel, possible fault. • The terminology for Earthing will be Open from Earth & Close to Earth.

  4. Principles Established (Overhead) • ABSD will be the terminology for handle & hook stick operated overhead Air Break Switches • All Pole Mounted Reclosures will be referred to as a PMR • All other pole mounded switches will be called Switch Disconnectors • DOEF’s, PDFI, PDSF will be known as HV fuses • Links will be known as HV Links • ERICS will be called ASLs

  5. Switching Instructions (ON/OFF) • Typically broken down to two parts the operation and consequence;

  6. HV Isolation Instructions

  7. LV Operation Instructions Generators

  8. Safety Documents Field Control

  9. Cables Testing NER’s

  10. Overhead Activities Miscellaneous