BRIEF ON Tehsil Municipal Administration Mailsi TMA Mailsi Online: tmamailsi

BRIEF ON Tehsil Municipal Administration Mailsi TMA Mailsi Online: tmamailsi.com. BASIC STATISTICS POPULATION As per Census 1998. RURAL URBAN. 350000 300000 250000 200000 150000 100000 50000 0.

maia
Download Presentation

BRIEF ON Tehsil Municipal Administration Mailsi TMA Mailsi Online: tmamailsi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRIEF ON Tehsil Municipal Administration Mailsi TMA Mailsi Online: tmamailsi.com

  2. BASIC STATISTICSPOPULATION As per Census 1998 RURAL URBAN

  3. 350000 300000 250000 200000 150000 100000 50000 0 BASIC STATISTICSLAND UTILIZATION TOTAL AREA (Acres) = 405483 %Age CULTIVATED = 314672 77.6 % UNCULTIVATED = 90811 22.4 % CULTIVATED UNCULTIVATED

  4. ORGANIZATIONAL STRUCTURE OF T.M.A, Mailsi Tehsil Nazim Asim Saeed Manais

  5. Composition of Tehsil Council

  6. BUDGET 2006-07 to 2008-09

  7. Available Resources

  8. DEVELOPMENT PROGRAMME YEAR WISE AMOUNT OF TEHSIL MUNICIPAL ADMINISTRATION MAILSI Rs. In Millions

  9. Projects Under PMDFC(Financed by World Bank)

  10. Future Plan Under PMDFC(Financed by World Bank) • Construction of Slaughter House • Construction of General Bus Stand • Construction of Under Pass. • Improvement of Fire Fighting System • Pavement of Streets • Improvement of Street Light • Comprehensive Sewerage Scheme (Western Part)

  11. Approved Projects of CCBs, TMA, Mailsi

  12. CCB Allocations Rs. Millions

  13. Water Supply • No. of tubewells for water supply (Existing) = 9 • No. of OHR (Existing) = 1 • No. of tubewell under execution = 10 • No. of OHR under execution = 03 (Direct pumping from 7 tubewells and from 2 tubewells water supplied through OHR) • Started maintaining log books for all tubewells to calculate the average hours of water supplied to households (Mohalla-wise) • Preparing data on monthly basis.

  14. Solid Waste Collection • TMA uses 2 trolleys and 7 donkey carts for solid waste collection from its main points • To calculate the solid waste collection: • Weigh the trolleys / donkey carts to find the carrying capacity of each vehicle used for solid waste collection. • Started maintaining register for counting no. of trips of each vehicle, collecting solid waste, from the month of January 06, as per guidelines of PMDFC. • Reporting data on monthly basis to PMDFC

  15. Avg. Solid Waste Collection per day (Jul – Oct, 2008) Calculations are based on average no. of trips per day and weighing capacity of each vehicle

  16. % 0f Street lights Working(Jul-Oct, 2008)

  17. Sewerage • Conducted a detailed survey (street wise) in July-Aug 06 for counting no. of households connected to the sewerage system through: • Open drains (Indirect) • Through sewer pipes (Direct)

  18. Complaint Tracking System • TMA adopted the suggested system of complaints tracking from Sep 06, as per guidelines of PMDFC. • Complaint cell established with designated staff and telephone line for easy public access • Standardized complaint register, provided by PMDFC, put in place to track the complaints • Starts reporting to PMDFC on monthly basis from Jan 07

  19. Data of Complaints (Jul – Oct, 2008)

  20. Encroachments

  21. 1 2 3 4 5 Problems Areas The Tehsil is Consists of 31 U.Cs & the available resources are not sufficient to meet the development requirements. No Municipal Magistrates are appointed by the Govt. under the PLGO,2001 for the effective enforcement of Municipal laws There are too many executing agencies which have no coordination with each other for development projects which causes the damage to existing infrastructure & wastage of public funds The Sui Northern Gas pipe line company has badly damaged the Municipal Services and there is no mechanism to rehabilitate the damaged infrastructure by the company. Under provions of PLGO, 2001 works relating to Municipal Services is the exclusive function TMA whereas other department execute the same without any authority which create complication in maintenance.