1 / 9

DeBakey HSHP NEW SCHOOL FACILITY

DeBakey HSHP NEW SCHOOL FACILITY. STATUS UPDATE PTA MEETING MAY 14, 2013. New School Facility - Proposed Location. W. Holcombe Blvd x Pressler St in the TMC 2151 W. Holcombe Adjacent to Texas A&M Health Science Center. New Facility - Proposed Location. Existing building

maia
Download Presentation

DeBakey HSHP NEW SCHOOL FACILITY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DeBakeyHSHPNEW SCHOOL FACILITY STATUS UPDATE PTA MEETING MAY 14, 2013

  2. New School Facility - Proposed Location • W. Holcombe Blvd x Pressler St in the TMC • 2151 W. Holcombe • Adjacent to Texas A&M Health Science Center

  3. New Facility - Proposed Location • Existing building • SW Corner of W. Holcombe • x Pressler • 5 floor Garage Building • Location Not Confirmed Yet • HISD is working with TMC • Quite a few challenges

  4. Design Process - HISD HISD Conference on March 6, 2013 Building 21 Century High Schools in HISD Guidance Principles 21st Century School Parameters Presentations by Leaders Texas workforce demands Transforming Career and Technical Education Significance of Math and Technical Skills

  5. Design Process - Community DeBakey & Community Come together Committees Brainstormed to develop “what would we want in a new school” Planning Meeting Feb 23, 2013 Formed 8 Committes Project Advisory Team Breakout Sessions Discussed Ideas For a 21st Century School

  6. HISD – Contractor Pre-qualifications HISD General Design Goal Pre-qualifications Short List Tens of Architects Feb – Apr 2013 1,000 hrs 3 Architects Shortlisted Based on experience Unique Facility Presentations to the PAT PAT’s Rating

  7. Interview Architects – HISD + DeBakey + Community April 22, 2013 at Hattie Mae ESC PageSoutherlandPage, Houston Lake Flato + WHR Architects, San Antonio and Houston HarrisonKornberg, Houston Presentations Architects Experience Samples Vision of Building School Challenges Design Process Community Engagement Feedback to HISD

  8. PATH FORWARD HISD Contractor Selection Lake Flato + WHR Architects, San Antonio and Houston Initiate Design Process Next 2 – 3 months DeBakey + Community Continue Dialogue Provide the “theme” to the Architects Guiding Principle for the design Engage in Design Process

  9. PATH FORWARD - YOU Check out Lake Flato’s website WHR Architects’ website Green School in North Dallas, etc. Updates provided through a blogpost or similar Under development

More Related