An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of FMS/Jet Meetings July 24 2014

  2. FMS Meeting: 7/21/14 • Discussion of progress refurbishing the FMS • First delivery of ~40-50 finished bases from PSU • Stacking to begin July 30 (Wednesday) • MrigankaMondal: discussion of problems with trigger threshold energies • Christopher Dilks: (Measurement of ALL for pions in FMS in Run 12/13)- Measured Transverse Spin Asymmetries (AN/ATT/AS) to estimate systematic errors on ALL in case of small transverse component. https://drupal.star.bnl.gov/STAR/blog/dilks/transverse-spin-asymmetries-run12-pp200

  3. Jet Meeting: 7/22/14 • Kevin Atkins: Discussion of how to determine phi_C systematic error in Run 12 Collins analysis: cross ratio or H2/H1 method- Decided on cross ratio method https://drupal.star.bnl.gov/STAR/blog/jkadkins/jet-meeting-phic-systematic-discussion • Grant Webb:Run 9 500 GeV p-p Underlying Event Analysis: JP1/JP2/AJP Triggers: Concluded that ADJP does not give results at low pT consistent with JP1/JP2 https://drupal.star.bnl.gov/STAR/blog/gdwebb/underlying-event-run-9-pp500

  4. Jet Meeting: 7/22/14 • Zilong Chang: Run 12 Inclusive Jet pT Shift Studies- Using Run 11 pp500 Embedding Sample. Need pT shift to correct pT for Detector (measured jets) -> Particle Jets -> Parton Jets (comparable to theory): Problem with pT bins <8.4 GeV, near trigger thresholds. Need extra systematic error. https://drupal.star.bnl.gov/STAR/blog/zchang/run12-inclusive-jet-pt-shift-studies-using-run11-pp500-embedding-sample