MAINTENANCE RATING PROGRAM Allen Mattox District Five Technical Support Manager. MRP HISTORY. Legislative Request Task Team First Survey 1985 / 86. 3 SURVEY PERIODS / YEAR. JULY - OCTOBER NOVEMBER - FEBRUARY MARCH - JUNE. WHAT IS MRP?.
E N D
MAINTENANCE RATING PROGRAMAllen Mattox District Five Technical Support Manager
MRP HISTORY • Legislative Request • Task Team • First Survey 1985 / 86
3 SURVEY PERIODS / YEAR • JULY - OCTOBER • NOVEMBER - FEBRUARY • MARCH - JUNE
WHAT IS MRP? • A visual and mechanical evaluation of routine highway maintenance conditions. • It is a report card for maintenance
Purpose of MRP • To provide information that should be used to schedule and prioritize routine maintenance activities. • To provide uniform maintenance conditions that meet established Departmental objectives.
FACILITY CLASSIFICATIONS • Rural Limited Access • Rural Arterial • Urban Limited Access • Urban Arterial • 30 Points are surveyed for each Facility Type.
ELEMENTS • Roadway • Roadside • Traffic Service • Drainage • Vegetation/Aesthetics
ROADWAYCharacteristics • Flexible Pothole • Flexible Edge Raveling • Flexible Shoving • Flexible Depression/Bump • Flexible Paved Shoulder/Turnout • Rigid Pothole • Rigid Depression/Bump • Rigid Joint/Cracking • Rigid Paved Shoulder/Turnout
ROADWAY Flexible Pothole Flexible Edge Raveling Flexible Paved Shoulder Turnout Flexible Bump / Depression Flexible Shoving
ROADWAY Rigid Depression/Bump Rigid Joint / Cracking Rigid Joint / Cracking Rigid Turnout
ROADSIDE • Unpaved shoulder • Front slope • Slope pavement • Sidewalk • Fence
ROADSIDE Unpaved Shoulder Front Slope Slope Pavement Sidewalk Fence
TRAFFIC SERVICESCharacteristics • Raised Pavement Markers • Striping • Pavement Symbols • Guardrail • Attenuator • Signs <= 30 sq. ft. • Signs > 30 sq. ft. • Object Markers and Delineators • Lighting
TRAFFIC SERVICESCharacteristics Striping RPM’S Pavement Symbol Guardrail
TRAFFIC SERVICESCharacteristics Attenuator Signs <= 30 SF Signs > 30 SF Object Markers & Delineators Lighting
DRAINAGE • Side/cross drain • Roadside/median ditch • Inlets • Miscellaneous drainage structure • Roadway sweeping
DRAINAGECharacteristics Side drain Cross drain Roadside/Medianditch Outfall ditch
DRAINAGECharacteristics Inlet Misc. Drainage Structure Roadway sweeping
VEGETATION AND AESTHETICS • Roadside mowing • Slope mowing • Landscaping • Tree trimming • Curb/sidewalk edge • Litter removal • Turf condition
VEGETATION AND AETHETICS Roadside Mowing Slope Mowing Tree Trimming Landscaping
VEGETATION AND AETHETICS Curb/Sidewalk Edge Curb/Sidewalk Edge Turf Condition Litter Removal
WHAT DOES THIS MEAN TO ME? • WHAT IS MY ROLE IN THIS?
As an inspector, your job is to make sure the contractor follows the plans and specifications.
MRP criteria is based on the Roadway and Traffic Design Standards. As long as you are following these standards, we will pass MRP.
Don’t get caught up in things you cannot control, such as plan design. We can get exceptions for these issues and not be scored on them. • Follow the Standards and Specifications.
http://www.dot.state.fl.us/statemaintenanceoffice/MaintRatingProgram.shtmhttp://www.dot.state.fl.us/statemaintenanceoffice/MaintRatingProgram.shtm