An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Silicon Strip Detector Section of LOI • Editors: David Lynn (primary), Nigel Hessey (secondary) • Subsections: • Silicon Strip Sensors • Strip System Front-End Design • Strip Modules • Thermo-mechanical Local Supports • Strip System Manufacturing and Production Plan • Strip System R&D Main LOI Twiki page with links to backup documents is: https://twiki.cern.ch/twiki/bin/viewauth/Atlas/UpgradeLOIPhase2ITK

  2. Silicon Strip Sensors • Coordinators: Y. Unno, M. Mikuz, P. Allport, H. Sadrozinski, C. LaCasta • Silicon Strips sensor will be embedded in a larger documents devoted to all sensor types • Sensors Backup Document • 1.1 Pixel sensors • Planar silicon sensors • 3-D silicon sensors • Diamond sensors • Silicon strip sensors • 1.2 Silicon strips sensors • Silicon strips document • Preliminary version on LOI twiki pages • Schedule • Last week update from Nobu Unno has them on track to be ready for AUW

  3. Strip System Front-End Design Coordinators: Alex Grillo, Philippe Farthouat, Alex Grillo, Mitch Newcomer Draft Outline (will be a long document) Very detailed outline written .Document will be long Note: If writing for Carl’s R&D section, for example, you do not have to explain in detail that which will be presented here

  4. Strip System Front-End Design -- continued Coordinators: Alex Grillo, Philippe Farthouat, Alex Grillo, Mitch Newcomer Preliminary list of authors • Proposed Schedule: • Coordinators will soon be contacting authors to solicit their contribution Have you been contacted if you are on the above list?

  5. Strip Modules (Ingrid & Tony to provide update) • Coordinators: Ingrid Gregor, Tony Affolder • Draft Outline (number of pages in parenthesis; total ~ 20 pages) • Introduction (1/2) authors: T. Affolder, I. Gregor • Module Description • Stave Modules (3) author: T. Affolder • Petal Modules (2) author: I. Gregor • Super Modules (3) authors: D. Ferrere, Y. Unno • Hybrids, Bus tape and EOS description (2) Authors: A. Greenhall, K. Mahboubi (hybrids) • C. Haber, T. Affolder, C. LaCasta (bus tape), M. Stanitzki (EOS) • Industrialization/manufacturability (1) • Module Production (3) authors: T. Affolder, I. Gregor • Special tooling and adhesives (2) authors: TBD • Performance (3) authors: TBD • Summary (1) authors: T. Affolder, I. Gregor • Proposed Schedule:  • Tony and Ingrid produce an outline document Dec 1  • Outline Document is circulated to the community Dec 1  • Community sends in text/information Dec 31 • In areas where there is no input, coordinators will chase folks for it Dec 31 • Draft document assembled and circulated Jan 20 • Finalized version circulated Feb 7  Coordinators are on schedule; just a couple subsections need identified authors

  6. Thermo-Mechanical Local Supports • Coordinators: Franck Cadoux, Eric Vigeolas, Richard Nickerson • Draft Outline (as presented @ AUW back in November): • Introduction 0.5 page • Local Support Structures (staves, petals, Super Modules) 10 pages • Mechanics 6p • Cooling 3p • EOS (including Cable bus and Connectors) 1p • Module Mounting 1.5 page • Interface to macro-support, including end insertion2.0 pages • Internal Alignment 1.0 page • FEA & Measurements on prototypes 3.0 pages • Thermal Performance 1.5p • Mechanical Performance 1.5p • Materials Studies2 pages • Proposed Schedule: • The production of the document is organised by LSWG coordinators, • Franck, to produce a skeleton document Dec 23 • Outline Document is circulated to the community Dec 23 • Community sends in text/information Jan 30 • In areas where there is no input, coordinators will chase folks for it Jan 30 • Draft document assembled and circulated Feb 29 • Finalised version circulated Mar 15

  7. Thermo-Mechanical Local Supports Update • Franck sent out document to be circulated Jan 23. • Would like to discuss now contend and who should write what. • Also should discuss alignment as requested in document • Open and discuss “thermomech backup.doc”

  8. Strip System Manufacturing and Production Plan Coordinators: Carl Haber Draft Outline Not yet provided Proposed Schedule: Not yet provided Status: ??

  9. Strip System R&D Coordinators: Carl Haber Draft Outline Sent out Jan 13, 2012, and requested subeditors write requested subsections. Proposed Schedule: Requested sections be written by end of January Status: ?? Carl to update and lead discussion