90 likes | 359 Views
Silicon Strip Detector Section of LOI. Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: Silicon Strip Sensors Strip System Front-End Design Strip Modules Thermo-mechanical Local Supports Strip System Manufacturing and Production Plan Strip System R&D.
E N D
Silicon Strip Detector Section of LOI • Editors: David Lynn (primary), Nigel Hessey (secondary) • Subsections: • Silicon Strip Sensors • Strip System Front-End Design • Strip Modules • Thermo-mechanical Local Supports • Strip System Manufacturing and Production Plan • Strip System R&D Main LOI Twiki page with links to backup documents is: https://twiki.cern.ch/twiki/bin/viewauth/Atlas/UpgradeLOIPhase2ITK
Silicon Strip Sensors • Coordinators: Y. Unno, M. Mikuz, P. Allport, H. Sadrozinski, C. LaCasta • Silicon Strips sensor will be embedded in a larger documents devoted to all sensor types • Sensors Backup Document • 1.1 Pixel sensors • Planar silicon sensors • 3-D silicon sensors • Diamond sensors • Silicon strip sensors • 1.2 Silicon strips sensors • Silicon strips document • Preliminary version on LOI twiki pages • Schedule • Last week update from Nobu Unno has them on track to be ready for AUW
Strip System Front-End Design Coordinators: Alex Grillo, Philippe Farthouat, Alex Grillo, Mitch Newcomer Draft Outline (will be a long document) Very detailed outline written .Document will be long Note: If writing for Carl’s R&D section, for example, you do not have to explain in detail that which will be presented here
Strip System Front-End Design -- continued Coordinators: Alex Grillo, Philippe Farthouat, Alex Grillo, Mitch Newcomer Preliminary list of authors • Proposed Schedule: • Coordinators will soon be contacting authors to solicit their contribution Have you been contacted if you are on the above list?
Strip Modules (Ingrid & Tony to provide update) • Coordinators: Ingrid Gregor, Tony Affolder • Draft Outline (number of pages in parenthesis; total ~ 20 pages) • Introduction (1/2) authors: T. Affolder, I. Gregor • Module Description • Stave Modules (3) author: T. Affolder • Petal Modules (2) author: I. Gregor • Super Modules (3) authors: D. Ferrere, Y. Unno • Hybrids, Bus tape and EOS description (2) Authors: A. Greenhall, K. Mahboubi (hybrids) • C. Haber, T. Affolder, C. LaCasta (bus tape), M. Stanitzki (EOS) • Industrialization/manufacturability (1) • Module Production (3) authors: T. Affolder, I. Gregor • Special tooling and adhesives (2) authors: TBD • Performance (3) authors: TBD • Summary (1) authors: T. Affolder, I. Gregor • Proposed Schedule: • Tony and Ingrid produce an outline document Dec 1 • Outline Document is circulated to the community Dec 1 • Community sends in text/information Dec 31 • In areas where there is no input, coordinators will chase folks for it Dec 31 • Draft document assembled and circulated Jan 20 • Finalized version circulated Feb 7 Coordinators are on schedule; just a couple subsections need identified authors
Thermo-Mechanical Local Supports • Coordinators: Franck Cadoux, Eric Vigeolas, Richard Nickerson • Draft Outline (as presented @ AUW back in November): • Introduction 0.5 page • Local Support Structures (staves, petals, Super Modules) 10 pages • Mechanics 6p • Cooling 3p • EOS (including Cable bus and Connectors) 1p • Module Mounting 1.5 page • Interface to macro-support, including end insertion2.0 pages • Internal Alignment 1.0 page • FEA & Measurements on prototypes 3.0 pages • Thermal Performance 1.5p • Mechanical Performance 1.5p • Materials Studies2 pages • Proposed Schedule: • The production of the document is organised by LSWG coordinators, • Franck, to produce a skeleton document Dec 23 • Outline Document is circulated to the community Dec 23 • Community sends in text/information Jan 30 • In areas where there is no input, coordinators will chase folks for it Jan 30 • Draft document assembled and circulated Feb 29 • Finalised version circulated Mar 15
Thermo-Mechanical Local Supports Update • Franck sent out document to be circulated Jan 23. • Would like to discuss now contend and who should write what. • Also should discuss alignment as requested in document • Open and discuss “thermomech backup.doc”
Strip System Manufacturing and Production Plan Coordinators: Carl Haber Draft Outline Not yet provided Proposed Schedule: Not yet provided Status: ??
Strip System R&D Coordinators: Carl Haber Draft Outline Sent out Jan 13, 2012, and requested subeditors write requested subsections. Proposed Schedule: Requested sections be written by end of January Status: ?? Carl to update and lead discussion