1 / 3

RCF Status

RCF Status. Smooth operation over the course of last week No reportable incidents of the Mass Storage System (HPSS), the Tape Libraries and the Network Data received from PHENIX & STAR Counting Houses was safely migrated to Tape

maire
Download Presentation

RCF Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RCF Status • Smooth operation over the course of last week • No reportable incidents of the Mass Storage System (HPSS), the Tape Libraries and the Network • Data received from PHENIX & STAR Counting Houses was safely migrated to Tape • Initially observed increasing aggregate data rates from the Counting Houses to RCF • PHENIX & STAR have accumulated ~620TB of RAW data since the start of Run12 (next slide) • Small data volume since end of 200 GeV running

  2. Physics Raw Data Volume collected & archived hiE pp loE pp AU PHENIX Raw Data 220 TB 4980 TB 2/10 3/13 3/20 STAR Raw Data 400 TB 3210 TB 02/10 3/13 3/20

  3. PHENIX and STAR Data Rate & Transfer Patternon the link between PHENIX and STAR Counting Houses (CH) Last 7 Days (03/013-03/20) PHENIX CH => RCF STAR CH => RCF 4 Gbps 6 Gbps Since Run12 started PHENIX CH => RCF STAR CH => RCF Data Volume collected by PHENIX and STAR in the last 7 days small

More Related