1 / 5

PERUVIAN ELECTRICITY SECTOR Prepared to: The Federation of Israeli Chambers of Commers 2.6.14

PERUVIAN ELECTRICITY SECTOR Prepared to: The Federation of Israeli Chambers of Commers 2.6.14. Electric Energy Production by source (%). ELECTRIC ENERGY PRODUCTION. Source: Committee of Economic Operation of SEIN. Source: Committee of Economic Operation of SEIN.

maj
Download Presentation

PERUVIAN ELECTRICITY SECTOR Prepared to: The Federation of Israeli Chambers of Commers 2.6.14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERUVIAN ELECTRICITY SECTOR Prepared to: TheFederation of IsraeliChambers of Commers 2.6.14

  2. Electric Energy Production by source (%) ELECTRIC ENERGY PRODUCTION Source: Committee of Economic Operation of SEIN Source: Committee of Economic Operation of SEIN The exploitation of the Camisea field has lead in the expansion of thermal generation, which has grown by an average annual rate of 22% for the last ten years.

  3. ELECTRIC ENERGY DEMAND Source: Committee of Economic Operation of SEIN Source: National Society of Mining, Oil and Energy The growth of the country's economic activity has generated an expansion of energy demand. The maximum demand of the National Interconnected Electric System (SEIN) amounted to 5,575 MW in 2013, which is 5.4% above the prior year. Regarding the electricity coverage, it reached 87.2% in 2012. The aim is to reach 90% in the coming years.

  4. SOLAR POTENTIAL The availability of solar energy is fairly uniform throughout the year within a margin of + / - 20% of the annual average. Source: Ministry of Energy and Mines

  5. 1st RER BiddingforEnergySupplyforNotConnectedAreas • Objective: Awardfor a 15 yearsperiod, theelectricitysypply of withRenewableEnergyResources up to 500,000 consumerslocated in isolated rural areas. Isexpectedtoachievetheinstallation of: • 410,000 panelsonhousings. • 7,500 panelsonEducationalInstitutions. • 2,100 panelsonHealthStablishments. • Authorizations and Permissions: Obtaining sectorial rights, permissiones o licencesisnotrequiredbecausetheequipmentwill be installedonusersproperty. • Competition factor: Annualcompensationproposal, thatshall be in accordancewiththe «Base Remuneration» establishedby OSINERGMIN. • Current Status: Registration of participants up toAugust 2014. • Price of Bases: US$ 1,000.00 Schedule

More Related