ME414 Spring 2006 Design Project 2 Heat Exchanger

ME414 Spring 2006 Design Project 2 Heat Exchanger. Ugo Anyoarah Osinanna Okonkwo Vinay Prisad Daniel Reed. Introduction. Introduction Project Definition Design Optimization Goals First Design Pass Second Design Pass Other Factors Design Results. Project Definition.

makaio
Download Presentation

ME414 Spring 2006 Design Project 2 Heat Exchanger

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ME414Spring 2006Design Project 2Heat Exchanger Ugo Anyoarah Osinanna Okonkwo Vinay Prisad Daniel Reed

  2. Introduction • Introduction • Project Definition • Design Optimization Goals • First Design Pass • Second Design Pass • Other Factors • Design Results

  3. Project Definition • During the make of a liquid chemical product, its temperature needs to be reduced by 10 degrees Celsius. • Mass flow rate is 80,000 kg/hr • Fluid enters the heat exchanger at 35 C and should leave at 25 C • Material properties of this chemical product can be approximated as water • Cooling of the chemical product will be achieved by using treated city water • City water is available at 20 C • Mass flow rate is adjustable and one of the design parameters to be selected • Exit temperature of city water from the heat exchanger is a function of the selected mass flow rate

  4. Design Optimization Goals • Must cool the chemical from 35 C to 25 C • Heat exchanger length can not exceed 7 m • Heat exchanger shell diameter can not exceed 2 m • Minimize heat exchanger shell and tube weight hence the cost • Minimize heat exchanger pressure drop

  5. First Design Pass • Matlab Variables • 4 variables • Tube_OD (6.350 – 25.4)e-3 meters • Shell_ID (.8 – 2) meters • Tube_Len (4 – 7) meters • N_tube (40 – 100) • 7 levels • Gives 7^4 = 2401 runs

  6. First Design Pass • Matlab Variables • Tube and Shell Material set to Aluminum • Consistent expansion between shell & tubes. • Maximum heat transfer • Corrosion Resistance (chemical similar to H20) • Tube pass set to two (2) • Most space efficient • Baffle Space set to 0.1048 m • Baffle Cut set to 0.3750 m • City water flow rate set to 38.8889 Kg/Sec

  7. First Design Pass • Matlab Results • Weight: 2069.17 – 22415.9 • DP Shell: 335149 – 6364756 • DP Tube: 17701.66 – 4.26e11 • Q Calc: 107043.7 – 919867.5 • 2401 runs = AAARRRGGGHHH!!!!!

  8. First Design Pass - MiniTab Results

  9. First Design Pass • Findings • MiniTab will not do Pareto charts for systems with more than 2 levels. • Higher levels ( >4) are beneficial for identifying linear regions and critical areas.

  10. Second Design Pass • Used Excel to find variable combinations with Qcalc/Qdes = 1 +/-10% • 12 combinations met criteria • Used the max and min in 2nd iteration of Matlab (2 level)

  11. Second Design Pass • Matlab Variables • 4 variables • Tube_OD (9.535 – 25.4)e-3 meters • Shell_ID (.8 – 1) meters • Tube_Len (6.5 – 7) meters • N_tube (90 – 100) • 2 levels • Gives 2^4 = 16 runs

  12. Second Design Pass • Matlab Results • Weight: 3444 – 5773 • DP Shell: 122279 – 3933472 • DP Tube: 24799 – 41293392 • Q Calc: 844667 – 919867 • 16 runs = MMM! (Much more manageable)

  13. Second Design Pass - MiniTab Results

  14. Second Design Pass - Optimizer

  15. Second Design Pass - Optimizer

  16. Second Design Pass • Check W/ Matlab • Number of Tubes N = 100.00 • Number of Passes = 2.00 • Tubes OD OD = 0.0191 m • Tubes ID ID = 0.0135 m • Tube Length L = 6.7500 m • Tube Pitch PT = 0.0238 m • Shell ID = 0.9000 m • Baffle Space = 0.1048 m • Number of Baffles = 63.0000 m • Desired Heat Transfer Rate = 928501.84 W • Calculated Heat Transfer Rate = 843364.57 W • Difference = 85137.28 W • Desired-to-Calculated Ratio = 1.10 • Shell Side Delta-P = 1517783.93 Pa • Tube Side Delta-P = 138509.45 Pa • Total HE Weight = 4550.87 kg

  17. Second Design Pass • Fouling Factor • Increased tube number to account for fouling • 116 tubes required for Q/q=1 • 135 tubes for Q/q=0.91 • DP Shell: Unchanged • DP Tube: 79943.83 Pa • Weight: 4607.82 Kg

  18. Other Factors • Full Factorial desirable • City Water Flow Rate • Baffle Spacing • Baffle Cut Height • Tube Pitch • Tube Layout Angle • Yields 12 factors • Even 2 levels is long: 4096 data points

  19. Design Results • Length: 6.5m • Shell ID: 1m • Tube OD: 19.1mm • Tube Length: 6.75m • Number of Tubes: 135