Common Methodology Group Work. Workstream 2 DRM and cost allocation methodology. PRESENTED BY María Isabel Liendo on behalf of Workstream 2. energynetworks.org. Summary. Last meeting 24 th August 42 meetings, 293 actions (!) 1 consultation on reactive charging
E N D
Common Methodology Group Work Workstream 2 DRM and cost allocation methodology PRESENTED BY María Isabel Liendo on behalf of Workstream 2 energynetworks.org energynetworks.org
Summary Last meeting 24th August 42 meetings, 293 actions (!) 1 consultation on reactive charging “General” consultation on CDCM (together with WS3) Stakeholder workshop after the general consultation was published IDNO/DNO billing consultation energynetworks.org energynetworks.org 2
Delivered CDCM model for tariff calculation IDNO model for calculating a discount to ATW tariffs Methodology statement User Manual (Internal) guidance documents for DNOs for population of the models energynetworks.org energynetworks.org 3
Next Steps… Most of WS2 work has been closed IDNO/DNO work transferred back to Ofgem chaired group and DCUSA working group Potentially some work under WS2 to look at some commonality issues energynetworks.org energynetworks.org 4