Common Methodology Group Work

Common Methodology Group Work. Workstream 2 DRM and cost allocation methodology. PRESENTED BY María Isabel Liendo on behalf of Workstream 2. energynetworks.org. Summary. Last meeting 24 th August 42 meetings, 293 actions (!) 1 consultation on reactive charging

makan
Download Presentation

Common Methodology Group Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Common Methodology Group Work Workstream 2 DRM and cost allocation methodology PRESENTED BY María Isabel Liendo on behalf of Workstream 2 energynetworks.org energynetworks.org

  2. Summary Last meeting 24th August 42 meetings, 293 actions (!) 1 consultation on reactive charging “General” consultation on CDCM (together with WS3) Stakeholder workshop after the general consultation was published IDNO/DNO billing consultation energynetworks.org energynetworks.org 2

  3. Delivered CDCM model for tariff calculation IDNO model for calculating a discount to ATW tariffs Methodology statement User Manual (Internal) guidance documents for DNOs for population of the models energynetworks.org energynetworks.org 3

  4. Next Steps… Most of WS2 work has been closed IDNO/DNO work transferred back to Ofgem chaired group and DCUSA working group Potentially some work under WS2 to look at some commonality issues energynetworks.org energynetworks.org 4