Experience with FC-Vehicles & Hydrogen Infrastructure in ZERO REGIO. Heinrich Lienkamp , Ashok Rastogi Infraserv Höchst - Frankfurt Germany. www.zeroregio.com. Outline Brief presentation of Aims, activities & highlights in Zero Regio (2004-2010) Frankfurt, Germany Mantova, Italy
E N D
Experience with FC-Vehicles & Hydrogen Infrastructure in ZERO REGIO Heinrich Lienkamp, Ashok Rastogi Infraserv Höchst - Frankfurt Germany www.zeroregio.com Rastogi / Lienkamp
Outline Brief presentation of Aims, activities & highlights in Zero Regio (2004-2010) Frankfurt, Germany Mantova, Italy Operational experience Some events Lessons learnt Collection and Assessment of Data Comparison with the state of the art Concluding Remarks; Next steps Rastogi / Lienkamp
Zero Regio Objectives Development and demonstration of H2 infrastructure and FCV‘s in European Cities Different hydrogen sources – By-product, industrial, On-site production 700 bar refuelling technology Integration of hydrogen in public service stations Socio-economic impact Project implementation: 11. 2004 –11. 2006 Construction 11.2006 -11. 2009 Demonstration; End May 2010 Rastogi / Lienkamp
Industrial Park Höchst 4.6 km2 area 72 km Streets 80 Companies Over 22000 Workforce & 30 mil.Nm3/yr By-product H2 Rastogi / Lienkamp
H2 - Infrastructure in Germany Hydrogen center in Industry park, Höchst Existing infrastructure By-product H2 is collected, conditioned, compressed (250 bar) Trailer station Ionic fluid compressor (900 bar) in Hydrogen center Agip station 1.7 km from H2-center Hydrogen transport to station via HP-pipeline (1000 bar) CGH2 dispensers, 350 bar and 700 bar one each LH2 dispenser (Truck supply of LH2) Agip station opened on Nov. 17, 2006 Rastogi / Lienkamp
Lay out HP Pipeline in Höchst Rastogi / Lienkamp
Hydrogen-Dispensers – Höchst GH2 700 bar GH2 350 bar LH2 Rastogi / Lienkamp
Experience with infrastructure in Germany High availability inspite of some problems: Filters in the cooling system of the compressor Some valves failed on the compressor system Some loose fittings leading to system failure Ionic Compressor overhauled in 2nd year of operation Outage for 3 months Filter problems in the third year, regular maintenance reqd. Insufficient purging of the pipeline initially Control valves at dispenser & minor electronic problems Incident reporting and management approach important One accident in the first year, no H2 discharge Rastogi / Lienkamp
Operational Experience in Germany Rastogi / Lienkamp
Damage of 700 bar Dispenser by accident Cause: Passenger car runs into dispenser Effect: major damage of dispenser and the installed techniqueNo accidental escape of hydrogen Action: Repair / replacement of dispenser Operational Experience in Germany Rastogi / Lienkamp
Servicestation Mantova Rastogi / Lienkamp
H2 - Infrastructure in Mantova, Italy On-site production facility (CPO – reformer) Small unit with 20 Nm3/hr Construction completed and in operation from July 2008 Truck transport from an industrial reformer (back-up) 350 bar GH2 dispenser (Cars homologated for 200 bar) Delay partly due to approval formalities A mobile refueller initially (AP 100) Integration in multi-energy Agip service station 17.000 m2, Car Wash, Cafè Shop Opening ceremony took place on 21 Sept. 2007 Rastogi / Lienkamp
CPO Reformer by Eni Rastogi / Lienkamp
Suitable for intermittent operation 3 Compaigns in 2009 20 kg. H2 in April 09 40 kg. H2 in July 09 (40 kg. Storage capacity) 40 kg. H2 in Oct. 09 One day for plant start-up and shut down High quality achieved (CO< 0.1 ppm) Plant optimised for automatic operation 20 Nm3/hr. too high for 3 cars Other applications planned at the service station On-site Hydrogen Production in Mantova Rastogi / Lienkamp
Dedicated Fleets Range: 250 km (@350 bar)Maximum speed: 135 km/hAcceleration: 0-50 km/h within 7 sNuvera PEM 70 kW 3 cars Range: 160 km (@350 bar)Maximum speed: 140 km/hBallard PEM 72 kW 5 cars, one with 700 bar storage Rastogi / Lienkamp
Beauty and the Beast F-Cell serving A-380 !! Rastogi / Lienkamp
Operational Performance of the vehicles in 2008 46 Some Demonstration Data Mileage Operating hours F-Cell No. 29 F-Cell No. 59, 60, 61 F-Cell No. 49 (700 bar) The operational performance 2008 was lower than expected Rastogi / Lienkamp
In general all FCV‘s functioned better than expected Regular maintenance was performed Tank leak tests TÜV examinations Minor repairs could be done on site No road calls One accident due to drivers negligence One car was taken out of service in Sept. 2009 due to IPT defect (Integrated PowerTrain failure) SOME INCIDENTS with Fleet Rastogi / Lienkamp
Frankfurt station is used also by other customers For 350 bar dispenser Honda (FCX Clarity), 2 cars Mazda (Ice, RX 8 Hydrogen), 1 car Toyota Prius one visit For 700 bar dispenser Opel/GM Hydrogen 4, 1 car B-class F-Cell Daimler, extensive testing with a few cars IR Communication, SAE Release A Standard 3 min. for 4 kg, aiming at 100% fill rate H2 Dispenser Deployment Rastogi / Lienkamp
Some Lessons Learnt • Serious problems with approval formalities in Italy • Delay in infrastructure construction • Fleet is still operated at 200 bar storage • European Harmonisation, Integrate authorities in project • Bottle neck for larger demonstrations • Fleet availability (cost), not so much infrastructure • Frankfurt station can fill 15-20 FCV‘s /hour • By-product Hydrogen should be exploited much more Rastogi / Lienkamp
Summary of 2 years • 3-7 FCV‘s, 100 vehicle months of operation, over 45000 km driven (should have been more) • Over 510 kg. H2 consumed, 7.2 tons of CO2 emission saved • Vehicles showed high reliability and availablity (98%) • Availability 350 bar dispenser 95% • Availability 700 bar dispenser 55% (accident costed 11 months) • Ionic compressor 77% (has been overhauled) • By-product hydrogen should be exploited more initially • Infrastructure problems experienced are not related to H2 Rastogi / Lienkamp
Concluding Remarks • H2-infrastructure developed and FCV fleet used in Zero Regio Project have been briefly presented • Operational experience has been encouraging at both sites • FCV-Fleets have operated better than expected • Fuel consumption of FCV is about half of NGV • Fast refuelling of 700 bar FCV‘s has been realised • Zero Regio high potentials: HP-Pipeline transport, Ionic liquid compression,700 bar refuelling with IR communication. Thank You • Final Conference at WHEC 2010, Essen, Germany. Rastogi / Lienkamp