1 / 14

New Central Library and Related Improvements 2 nd Street Extension & Bridge over Shoal Creek

New Central Library and Related Improvements 2 nd Street Extension & Bridge over Shoal Creek Shoal Creek Greenbelt Improvements Seaholm Substation Wall. Executive Team Meeting – October 9, 2014. Agenda. Project Photographs Project Status – Schedule Current Issues

Download Presentation

New Central Library and Related Improvements 2 nd Street Extension & Bridge over Shoal Creek

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Central Library and Related Improvements 2nd Street Extension & Bridge over Shoal Creek Shoal Creek Greenbelt Improvements Seaholm Substation Wall Executive Team Meeting – October 9, 2014

  2. Agenda • Project Photographs • Project Status – Schedule • Current Issues • Questions – Topics for Next Meeting • Next Scheduled Meeting – to be determined 1 New Central Library and Related Improvements

  3. 2 New Central Library and Related Improvements

  4. 3 New Central Library and Related Improvements

  5. Soil retention system installation Concrete Placement – 05/09/14 4 New Central Library and Related Improvements

  6. 5 New Central Library and Related Improvements

  7. 6 New Central Library and Related Improvements

  8. Project 2009 2010 2011 2012 2013 2014 2015 2016 Schedule Status New Central Library Package 1- soil retention & utilities Package 2 - core & shell Package 3 – finish out Move-In & Set up 2nd Street Package 1 - utilities Package 2 – bridge & bank stabilization Package 3 - roadway & landscaping Seaholm Substation Wall Design Bid Construction Move-in & Set up Today Legend: 7

  9. Hensel Phelps - Contract Summary 8 New Central Library and Related Improvements

  10. Hensel Phelps - MBE/WBE Summary • See attached Spreadsheet 9 New Central Library and Related Improvements

  11. Current Issues • New Central Library • Issuance of Building Permit – one last Fire Department requirement is to be completed by the Joint Venture this week. Full Building Permit should be released soon thereafter. • Revisions to the City Code - to allow concrete placement during overnight hours. • 2nd Street Bridge and Roadway Extension • Removal of the LAB Detour: there is efforts in place to remove the detour once Seaholm Drive is opened to the public. 10 New Central Library and Related Improvements

  12. Current Issues, continued • Seaholm Substation Screen Wall • Scope included in Partial GMP3: Concrete foundation, Retaining walls, Drilled piers, Survey, Erosion control, and Tree protection. Notice to Proceed with construction has been issued. Balance of the Screen wall scopes will be included in Final GMP4. • Project Status – Artist team has completed re-design: • East wall has been changed to create the requested AB pattern. • West wall – Re-designed due to Subsurface investigation results showing utility conflicts. Design consists of a precast concrete base with perforated metal panels and perforated metal in-fill and gates. • Lighting design has been incorporated to West, North, and South walls. • PSA Amendment with NADAAA - for project re-design, Lighting design and Construction Administration has been split into two; second portion will go to City Council for approval. • Funding - Public Expectations – Design revisions presented to AIPP, Arts Commission, Downtown Commission, and Design Commission. Presentations to Electric Utility Commission and CMO after final cost is received from CM@R. Tentative time for presentation toCity Council is at the end of November. 11 New Central Library and Related Improvements

  13. Current Issues, continued • Adjacent projects • Seaholm Redevelopment • Coordination between Hensel Phelps & Flintco – ongoing by weekly • Shared Access of West Avenue ROW - ongoing but very complicated due to Flintco’s construction & West Avenue Construction • Green Water Treatment Plant Redevelopment • Coordination between Hensel Phelps & Trammell Crow on Bridge Construction – bridge components to begin arriving today. 12 New Central Library and Related Improvements

  14. Questions – Topics for Next Meeting 13 New Central Library and Related Improvements