An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Patrick’s Updates - 8/30/11(one slide for each of the following) • XTCAV Project • ASTA Gun Test Facility Instrumentation & Controls • Fast wire scanner project • Sector 0-10 Injector Test Facility Project • An idea for a 2.5 GeV linac SX-Ray FEL

  2. XTCAV Highlights • Long lead time purchases for modulator and TWT Amplifier underway • Design of LLRF controls is based on VME architecture with LCLS PADS, PAC and new MKSU-II handling standby and accelerate trigs. (IOC -TS) • Orders placed for fabrication of second XTCAV structure. • Tunnel penetrations measured during last PAMM and design of waveguide layout started. • Revised B921 layout to move AC switch gear so modulator can be maneuvered into building.

  3. ASTA Gun Test StandInstrumentation and Controls • Small quantities, but at least one of each system required: • LLRF synchronization and timing • Vacuum pumps, gauges and valve controllers • Solenoid, dipole and corrector magnet controllers • 2 BPMs, 2 Prof Monitors, 2 FARCs • Laser motion controls, cameras, diodes ADCs • Separate network, like we did for FACET, with servers, archivers, striptool, messaging. • No MPS. No controls status for PPS, BCS.

  4. Fast Wire Scanner Prototype • Piezo stage with Mikos controller due next month. Radiation test. • Delta Tau controller with linear stage due mid October. • Nia Fong joins the department 10/3 • Magnetic head precision positioner system at IBM

  5. Sector 0-10 Injector Test Facility Project • CD-0 for the Project requires a WBS and Cost Estimate • trying to organize and transfer as much as possible from the LCLS-II project • DOE dictates the formal use of WBS, E-Cost Books and Basis of Estimate Documentation • This project removes more than 2 sectors of accelerator • What shall we do with it!

  6. An idea for a 2.5 GeV linac SX-Ray FEL • Is there a dedicated Soft X-Ray FEL in SLAC’s future? • LCLS-II is trying hard to do it all in one machine. Our forté is high-energy beams for high-power hard x-rays. • Why not take the 200 m of accelerator from sectors 8-9 and build a separate accelerator to operate independently for soft x-rays. Soft x-rays only need short undulators. • LCLS-II can be better optimized for hard x-rays

  7. Tunnel elevation Tunnel crossection