Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management. Don Wells (Hess). Agenda. Introduction Membership General Plans / Progress Detail Progress Integration 17 Committee/ISO. Introduction.
E N D
Revision of API RP 17NSubsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Agenda • Introduction • Membership • General Plans / Progress • Detail Progress • Integration 17 Committee/ISO
Introduction • Incorporate Integrity Management into current API 17N …Subsea Reliability and Technical Risk Management • Recognize and incorporate integration with other Industry initiatives • Incorporate updates based on feedback from using existing 17N document • Respond to recent industry experiences
Membership • Organized into subcommittees • Design and Decommission • Manufacture, Assembly, SIT, Installation, Commissioning • Operations • Technology Qualification • Regulations • Room for additional membership • Opportunity to Make a Difference
Membership • Graeme Davies – DNV • John Fassero – ExxonMobil • Karl Woods – Woodside • Martha Viteri – DNV • Michael Taylor – FMC • MzahidMamot – Petronas • Paul Kefford – Chevron • Reza Mostofi – DNV • Ronald Pechacek – NASA – United Space Alliance • Stephen May – Cameron • Mike Theobald – Maersk Oil • Karina Vitale – Chevron • Runar Østebø –Statoil • Jason Strouse – National Coupling • Anibal Dam – BP • John Macneill – Stress Engineering • Chairman 2012 • Don Wells – Hess • Co-Chairman • John Allen - GE • Mark Siegmund – BP • Champion • John Strutt - Astrimar • Record Keeper • Adriana Botto – Wood Group I.M. Membership • Lars Buus - DNV • David Valentine – NASA – United Space Alliance • Denver Roopchand – Atkins • Dane Tipton – National Coupling • Fuad Ahmad – Petronas • James Cencula – GE
Mandate / Goals • Add Integrity Management to Current Document • Incorporate into all existing KPs & Stages from Concept to Installation / Commissioning • Add an Operations Stage / Section • Change Tone from Production to Integrity • Current tine reflects maximizing production • Will add Broader Integrity • Environment, etc. • Decide on Prescriptive vs. Safety Case • Ensure Tie-in with other API documents • i.e. API 17 V
General Progress • 2010 – 2011 • Storming and forming - Complete • Gap Analysis – Mostly Complete • Added Runar Østebø – Statoil & convener of ISO/TC67 WG4 • 2012 - Planned • Define Tone (prescriptive / recommend) • Work the Gaps • Work the Interfaces • Industry Peer Assist Workshop (SURF IM Forum)
Detailed Progress • Define Scope _ • Define Charter _ • Divide and Conquer…..Regular Subcommittee meetings 1. Design and Decommission • New Key Process (KP) for Through Life under development • Does API want Risk Based or Safety Case Approach? (Hybrid?)
Detailed Progress Divide and Conquer – cont. 2. Manufacture, Assembly, SIT, Installation, Commissioning • Matrix Developed • Where & How to test being worked • Does Verification and Validation need new KP? (Rewrite KP06?) • MOC being worked
Detailed Progress Divide and Conquer – cont. 3. Operations • Reviewed and Raised issues with existing 12 KPs • Proposed 3 additional KPs • Field Modifications • Inspection and Monitoring • Remedial Intervention • Added 3 Processes to “Project Phase Guide to Processes”
Detailed Progress Divide and Conquer – cont. 4.Technology Qualification • New Risks Identified – commercial obsolescence • Keep integrated as a section in API 17N • Utilize DNV RP A-203 as much as possible • Completed Activities • Received industry feedback on main challenges with Qualifying Technologies • Strawman created for TQ section • Activities in Progress • Drafting started • Defining the proper use of TRLs • Path Forward • Consolidate and review individual sections
Detailed Progress Divide and Conquer – cont. 5. Regulations • Managing Committees 1-4 Interfaces • Will lead Prescriptive vs. Recommend discussions • On hold until more definition / decisions from other committees
Path Forward • Path Forward • Continue Subcommittee work • Outline of Process to use as QA tool • Common Matrix to combine / review completed work • Work the idea of using SURF IM Forum to discuss with industry and gather additional input • Write • Review • Ballot – still aiming for year end 2012
Integration • API 17A, API Q1 • ISO • 14224 - Collection and exchange of reliability and maintenance data for equipment • 20815 - Production assurance and reliability management • 15663 - Life Cycle Costing • TR 12489 - Reliability modeling and calculation of safety systems • Review committee draft document • Feedback 17N specific comments • DNV RP A203/API RP 17Q?