1 / 16

CEDAR from flammable gas safety point of view

CEDAR from flammable gas safety point of view. CEDAR – ČErenkov Differential counter with Achromatic Ring focus. Pumping outlet. Diaphragm motor and diaphragm opening potentiometer – inside of motor cover. Motors and gas control unit – will be replaced. 8 q uartz w indows.

malory
Download Presentation

CEDAR from flammable gas safety point of view

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEDAR from flammable gas safety point of view FV

  2. CEDAR – ČErenkov Differential counter with Achromatic Ring focus Pumping outlet Diaphragm motor and diaphragm opening potentiometer – inside of motor cover Motors and gas control unit – will be replaced • 8 quartz windows VF

  3. CEDAR inside VF

  4. CEDAR – in the TTC8 VF

  5. CEDAR – Vessel and gas • Vessel: • Geometry: • Total length - 6.2m • Main vessel length - 4.5m • Inner diameter - 53.4cm • Steel pipe • Polyurethane foam thermal insulation – 10cm around the counter • Gas: • Volume -1.1m3 • Composition – 100% H2 • Operating pressure – between 2.5 and 3.5 bar absolute, up to 4 bar during a pressure scan VF

  6. CEDAR – gas system, nitrogen enclosure N2 H2 VF

  7. Pumping outlet • Safety valve • Big O-ring of the nose Diaphragm motor and diaphragm opening potentiometer – inside of motor cover • PT100 • Entrance window VF

  8. CEDAR – control unit below the nose VF

  9. CEDAR – list of possible leaks (Jens Spanggaard) • Entrance Window • Quartz Windows • Big o-ring for the noise • Top vacuum valve • Top safety valve • Diaphragm motor axe feed-trough (on top of H2!) • Gas pipe for pressure gauge (Should be Ex proof !) • Gas pipe for servo regulator • Gas pipe for inlet/outlet • Big o-ring for end-cap • End window VF

  10. Top vacuum and safety valves Diaphragm motor axe feed-trough Gas pipe for pressure gauge Big o-ring of end cup • Entrance Window Big o-ring for the noise • Exit Window Quartz Windows VF

  11. CEDAR – other features • Equipment inside of nitrogen enclosure • 240 photomultipliers operating at high voltage • Preamplifiers and signal-shaping electronics • Heat exchangers • Electrical equipment of CEDAR (all motors and end-switches are 24V) • Diaphragm end-switches – inside the H2 volume ( !) • Diaphragm motor and Diaphragm opening potentiometer – inside of motor cover, on top of the front flange • Control unit below the nose • Horizontal and Vertical Position motors with end-switches and position potentiometers – downstream support • 4 PT100’s: entrance window, front and back flanges, air VF

  12. CEDAR – Noise conceptual design VF

  13. From the minutes of H2 safety CEDAR meeting 24-11-2008 (Lau Gatignon) • The diaphragm motors,  the PMTs and the control unit below the nose must be enclosed in a Nitrogen enclosure at slight overpressure. Inside this enclosure a Hydrogen detector must be placed. No special precaution is required for the X/Y motors for the Cedar alignment. Quartz Windows • The Hydrogen bottle will be stored in a gas building outside the cavern. Gas will be brought to the counter via a stainless tube of minimum diameter 6 mm. The gas pressure will be limited by a safety valve to a maximum of about 4 bars. This valve will be inspected regularly like all pressure valves. The return tube must be stainless steel as well and of at least 8 mm diameter, to avoid the build up of local gas concentrations. It should be equipped with no-return valves. It should release the gas outside at a sufficient height (about 3 meters above ground level). • The CEDAR pressure pumps must be Hydrogen rated (“EX” norm). Similarly the nearby pumps in the beam vacuum sections just upstream and downstream. Note that the vacuum window may be damaged by the Cedar entrance or exit windows in case they rupture. • Two domes shall be installed, one above the nose and control unit and one above the exit window. Both shall be equipped with Hydrogen detectors. In case all purged Nitrogen enclosures are equipped with Hydrogen detectors, the domes are probably not necessary. • In case of rupture of one of the windows or Hydrogen detection by one of the detectors, a Level-3 alarm will be sent automatically to the Fire Brigade. And the Cedar pumps, motors and PMTs, as well as nearby beam vacuum pumps will be stopped. Sector valves will be closed in the nearby beam line vacuum sectors. • Procedures will be made available that describe all steps in the normal operation of the CEDAR (empty before filling with Hydrogen, how to vent), as well in case of e.g. leak detection or window rupture. This includes the technical intervention, but also whom to inform and what alarms to send where. VF

  14. Spares VF

  15. Beam pipe connection The CEDAR must be connected to the vacuum beam pipe at both ends in such a way that a hydrogen leak is not accompanied by any admixture of air in order to prevent any risk of explosion. An important secondary consideration is that damage to sensitive detectors must be minimised by mitigating the effects of hydrogen leaks and the shock wave resulting from the potential rupture of the window at either end of the CEDAR VF

  16. CEDAR – gas operation • Before introducing any H2 gas, the entire system (including the detector) is filled with clean and dry N2 • The detector is then pumped to vacuum using a dry membrane vacuum pump down to 5 mbar and willed with H2 gas • At the end of a physics run the Hydrogen is pumped out and the detector is refilled with nitrogen. VF

More Related