1 / 6

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator 30mm and 40 mm bars, each 3mm x 3mm. Light up light guide bars to Hamamatsu SiPMs MPPC S10943.(Sergey Los). SiPMs. p (120 GeV ). 2 boxes like this, so 4-in-line bars at at time. 2mm x 2mm trigger counter. PMT240

mandar
Download Presentation

T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T979 (~10) Picosec timing: LBQ = L-bar Quartz Cherenkov radiator 30mm and 40 mm bars, each 3mm x 3mm. Light up light guide bars to Hamamatsu SiPMs MPPC S10943.(Sergey Los) SiPMs p (120 GeV) 2 boxes like this, so 4-in-line bars at at time

  2. 2mm x 2mm trigger counter PMT240 MCP, ref time Two L-Bar Quartic boxes Beam, 120 GeVp

  3. Beam deliberately through light guide bars

  4. Scope traces (5 GHz, 200ps/pt) 3 bars with PMT240 (bottom) 2 ns/div & 20mV/div Without clipping Capacitance With clipping Capacitance Rise times < 1 ns, good.

  5. Successful runs, data being analysed. Await resolutions.

More Related