Local Area Augmentation System (LAAS) Draft Benefits Analysis August 2004

Local Area Augmentation System (LAAS) Draft Benefits Analysis August 2004. Background. Original Contract Established With PWC – June 2002 Identify and Quantify Safety and Efficiency Benefits Analyze Potential Savings Through LAAS Commissioning Contract Modified – August 2003

mandek
Download Presentation

Local Area Augmentation System (LAAS) Draft Benefits Analysis August 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Local Area Augmentation System (LAAS) Draft Benefits AnalysisAugust 2004 DRAFT

  2. Background • Original Contract Established With PWC – June 2002 • Identify and Quantify Safety and Efficiency Benefits • Analyze Potential Savings Through LAAS Commissioning • Contract Modified – August 2003 • Expanded to Include Comparison of Incremental Benefits to Navigation Baseline • ASD ROM Analysis Released – October 2003 • Results Costs Exceeded Benefits (0.5:1 BCA) • Management Supported Continuation of IBM Analysis • Complete Detailed Independent Analysis of Potential Benefits • Draft Report – September 2004 (Flight Plan Goal) • Final Report – October 2004 DRAFT

  3. Why An Independent Analysis? • To Conduct An Objective Assessment of the Benefits That LAAS May Provide to Aviation System Users • To Provide Fact-Based Support For Government and Industry Decisions • Credibility and Transparency With Industry Stakeholders • Using Data Provided By Airlines and Airports • Validate Findings Through Site Visits • Memphis, Seattle, Bradley, Newark, Chicago • FedEx, Alaska, United, Continental, Southwest • Boeing • Update Industry Stakeholders Through Regular Communication • Formal Conference Calls to Review Methods and Results • Informal Discussions, Conversations • NOT a Formal Business Case or Alternatives Analysis DRAFT

  4. Approach • Created a LAAS Benefits Analysis Team to Develop Initial Assumptions and Provide Feedback During the Study Period • Team Included ASD, AVR, IBM, MITRE, and the LAAS Program Office • LAAS Benefits Accrue Only When Capabilities Are Provided Above and Beyond Those Provided by Other Systems • Assumes No Decommissioning of Any Existing Systems • Current ILS’s Retained • No New ILS’s Installed After IOC (FY2009) • Benefits For Continuing ILS In Lieu of LAAS Are Not Analyzed • Analysis Includes Both 100% and 0% WAAS Equipage Scenarios • Study Limited to Top 120 NAS Airports • Major Airlines’ Top Airports (88) • NBAA Top 10 Airports • RAA Top 50 Airports • LAAS LRIP Sites (6) • OEP Airports (35) • Current Cat II/III ILS (79) • Qualifier Cat II/III ILS (2) DRAFT

  5. Navigation Capabilities Baseline • NAS Baseline • Existing Navigation Systems Deployed in the NAS • Navigation Systems Planned to be Deployed in the NAS During the Twenty Year Time Horizon (2009-2028) • User Baseline • Existing Navigation Equipage of Avionics Systems Available • Newer Technologies Expected to be Available During the Twenty Year Time Horizon (2009-2028) • Users Include • Major and Regional Air Carriers • Cargo and Passenger • Domestic Operations • Corporate • GA (Alaska Only) • Baseline Does Not Include Systems in the R&D Stage That Have Not Been Through Proof of Concept • Baseline Does Not Include the Impact of Installing ILS at Every Runway End DRAFT

  6. LAAS Incremental Capabilities • Identify LAAS Capabilities Above and Beyond Those in the Existing Baseline • Incremental Capabilities Include: • Precision Approach and Guidance to Multiple Runway Ends From a Single LAAS Ground Facility • Greater Siting Flexibility • Multiple Glideslopes For Aircraft Simultaneously Approaching the Same Runway • Displaced Threshold Without Physical Relocation of the Ground Facility Components • Complex Guidance For Approach, Missed Approach, or Departure Segments DRAFT

  7. LAAS Efficiency Benefits • Benefits That LAAS Capabilities Have on Disruptions and Efficiency Above and Beyond the Existing Baseline • Efficiency Benefits Include: • Reduced Flight Disruptions for Straight-In Precision Approaches • Reduced Flight Disruptions with LAAS Precision Takeoff Guidance • LAAS-Based Complex Procedures • Elimination of ILS Critical Areas • Closely Spaced Parallel Approaches DRAFT

  8. LAAS Safety Benefits • Conducted by Flight Safety Foundation • Incremental Safety Benefits LAAS Provides Above and Beyond the Baseline • Safety Benefits Include: • Reduced Accidents and Incidents Because of Greater Precision Approach Coverage • Positive Surface Guidance in Reduced Visibility • Current Level of Safety Benefits Are Maintained or Improved During Transition DRAFT

  9. Societal Benefits • International Leadership • Importance of Maintaining U.S. Industrial Leadership in the World • Ability to Use Common Avionics/Procedures Worldwide For Seamless and Simplified Navigation • Noise Abatement and Mitigation • Reduced Impact on Environmentally Sensitive Areas • Societal Benefits Include: • Noise Rule Violation Costs • Land Acquisition for Noise Compatibility • Residential and School Soundproofing • Reduction or Lifting of Curfews DRAFT

  10. Dallas Love Field 18 Current Cat I ILS Runways Proposed Cat II/III LAAS Runways 13L 13R 36 31R 31L DRAFT

  11. Current Operation Cat I ILS on four runways 13 L/R 31 L/R No Cat II/III system 0.4% of DAL weather is Cat II/III per year Actual Annual Cat II/III Disruptions (Major Airlines): Delays = 362 Cancellations = 56 Diversions = 23 LAAS Incremental Benefits Cat II/III landing guidance LAAS Cat II/III approach operations on 13L & 31L Estimated Annual Cat II/III Disruptions With LAAS (Major Airlines): Delays = 168 Cancellations = 15 Diversions = 18 DAL Example DRAFT

  12. Example - DAL Inputs Used in the Straight-in Analysis DRAFT

  13. Summary of LAAS Benefits(120 Airports 2009-2028) DRAFT

  14. Proportion of the Discounted 20 Year LAAS Best Estimate Benefits • The largest benefit is achieved for straight-in approaches, with the largest portion of that being due to LAAS Cat II/III DRAFT

  15. ILS Comparison • ILS Upgrade/Replacement Costs vs. LAAS or MLS • Estimate the Ground Equipment, Installation, Operations, and Maintenance Costs Associated with Replacing or Upgrading Existing ILS Installations with Either ILS, MLS, or LAAS • Cost Analysis of Precision Approach Alternatives • Evaluate the Relative Costs of Future Allocations of ILS, LAAS or MLS Ground Equipment • Alternatives Evaluated: • Install LAAS • Install One or Several ILS (s) • Install One or Several MLS (s) DRAFT

  16. Sensitivity Analysis & Issues • IBM is Conducting a Sensitivity Analysis to Address Concerns Raised During the Study Period • LAAS Avionics Installed Over a 6 Year Period, Beginning at IOC • Minimum LAAS Avionics Equipage Level for Benefit: 80% • Airline Direct Operating Cost of a Flight Disruption • Coordinating With ASD on Open Issues: • Estimate for Duration of Delays • Cost of Disruptions • Airport Configurations DRAFT

  17. Schedule DRAFT

  18. BACK UP SLIDES DRAFT

  19. LAAS Characteristics • One LAAS Provides a Signal Suitable for Use at Most Runway Ends at an Airport Compared to One ILS Per Runway End • Does Not Have Runway Specific Critical Areas • Critical Areas Mitigated by Siting Flexibility • Easier to Maintain • Fewer Components Per Airport Architecture Allows Multipath Masking • Less Vulnerable to RFI Than ILS • Immune to Spoofing • Airborne Antenna is Less Susceptible to Jamming DRAFT

  20. Map Of Airports DRAFT

  21. ILS/LAAS Costs • ILS Costs • Equipment • CAT I $150K • CAT II/III $200K • Installation • Replacement $300K • New $600K • LAAS Costs • Equipment $500K-$600K • Installation $250K-$600K DRAFT

More Related