100 likes | 378 Views
Report. As part of the subcommittee towards RP 17U, the work realized includes the following:Previous Work Concluded (Wet Insulation)Review of current work (General/Wet Insulation)New work (Dry Insulation)Consolidating and combining sections of document per API guidelines:TOC updatedSelecting
E N D