Brent Sustainability Forum - Civic Centre Update. Aktar Choudhury Civic Centre Team. Brent Council. Progress…. CGI. 2013. Commitment to BREEAM Outstanding from outset. Design Stage Outstanding Awarded September 2012 S core of 92.55 per cent

manju
Download Presentation

Brent Sustainability Forum - Civic Centre Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brent Sustainability Forum - Civic Centre Update Aktar Choudhury Civic Centre Team Brent Council

  2. Progress…

  3. CGI

  4. 2013

  5. Commitment to BREEAM Outstanding from outset. Design Stage Outstanding Awarded September 2012 Score of 92.55 per cent Greenest public office building in the country Fourth greenest building worldwide Only ten have received BREEAM Outstanding rating. A model of Sustainability – BREEAM Outstanding

  6. Natural building ventilation Rainwater harvesting Indoor winter garden and green roofs A green transport plan including 250 cycling spaces and charging points for electric cars sustainably sourced building materials landscaped courtyards planted with carefully selected drought tolerant species IT offer i.e. Colorqube printers, thin client Air source heat pumps CHP Envac Sustainable Elements –Highlights

  7. Features will combine to allow the Civic Centre to achieve a 33 per cent reduction in carbon emission with energy consumption Two times less than for similar conventional buildings Draft EPC ‘A’ rating with score of 22. Potential to lower this still. Average score for a newly built building is 60. Sustainability measures included within all major procurement activities including architect, contractor, furniture and removals. Sustainable Elements –Highlights

  8. Timeline to Occupation • January to March 2013 -Fit out the building with furniture and IT • April – July 2013 Staff move into the building

  9. Any questions?