1 / 5

Post-2012 PTF

Post-2012 PTF. PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science. 2013-2014: iPTF. PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science. Same equipment, faster cadence: main goal for SNe : early time. 2013-2014: iPTF. PESSTO meeting 2012

manning
Download Presentation

Post-2012 PTF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Post-2012 PTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science

  2. 2013-2014: iPTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science Same equipment, faster cadence: main goal for SNe: early time

  3. 2013-2014: iPTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science A lot of PTF resources will be pointed at rapid response; PESSTO is perfect for complementary long-term campaigns

  4. 2013-onward: SEDM PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science Dedicated low-res screening spectrograph on the 60” (perhaps also ICAM on INT). Crucial help for screening (only 46/month by PESSTO), while PESSTO can excel at follow-up

  5. 2015-2018: NGTF PESSTO meeting 2012 Avishay Gal-Yam Weizmann Institute of Science Even at higher cadence SN discovery rate would equal PTF peak rates (~1000 year). PESSTO will be crucial for screening and follow-up.

More Related