1 / 20

XMM-Newton Cross-Calibration Status Meeting Summary: Achievements and Future Plans

Detailed summary of the XMM-Newton cross-calibration status meeting held in Mallorca on 06-07 November 2007. Martin Stuhlinger and the cross-calibration team presented findings on AGN flux ratios from 3C273 and H1426+428, galaxy cluster temperatures, and low-energy stability of RXJ1856-3754. The archive's upcoming public release in 2007 and processing updates using ESAC grid were discussed. Cross-comparison statistics between XMM-Newton, Chandra, and Suzaku, with analysis on spectral slopes and normalization uncertainties were highlighted.

manueld
Download Presentation

XMM-Newton Cross-Calibration Status Meeting Summary: Achievements and Future Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of XMM-Newtoncross-calibration with SASv7.1 CAL Meeting Mallorca, 06.-07.November 2007 Martin Stuhlinger with inputs/support from whole cross-calibration team

  2. AGN

  3. AGN

  4. AGN

  5. AGN

  6. AGN

  7. AGN

  8. Flux ratios using 3C273 SASv7.0 SASv7.1

  9. AGN

  10. H1426+428: Single Power Law

  11. Galaxy Clusters

  12. Galaxy Clusters

  13. Galaxy Cluster: Temperatures

  14. Low Energy Stability: RXJ1856-3754

  15. RXJ1856-3754: Absorbed black body

  16. Cross-calibration archive • to go public by end 2007 • Current content: • ~ 250 observations • ~ 150 checked in for automated processing (XMM only) • ~ 20 checked in for automated processing (XMM-Chandra) • all will be checked in by end 2007 (definition of extraction region/times and check for pile up needs to be checked and iterated ONCE manually) • Using ESAC grid: • 10 nodes so far, each node has 2 CPUs Intel(R) Xeon(TM) 3.00GHz with 6GB of memory • process and fit 150 Observations /24 hours

  17. 2007 2005 2006 Cross-calibration: Statistics SASv7.0 SASv6.5 SASv7.1

  18. XMM-Newton / Chandra

  19. XMM-Newton / Chandra

  20. XMM-Newton / Suzaku Suzaku extraction script ready. Spectral slopes agree well. Correct normalisation still slightly unclear due to open questions on data extraction.

More Related