150 likes | 261 Views
Precipitation verification at DWD 29th WGNE meeting, 10-13 March 2014, Melbourne U. Damrath (DWD). 1000 stations; controlled data are available around 10 days after measurement. Verification method:
E N D
Precipitation verification at DWD29th WGNE meeting, 10-13 March 2014, MelbourneU. Damrath (DWD) M. Baldauf (DWD)
1000 stations; controlled data are available around 10 days after measurement. Verification method: Aggregation to a 1° x 1° grid: forecasts in the model grid, observations as so called superobservations in each model grid. 2
Weare sorry for not considering Laurie Wilson‘s • Verificationproposal, due toseveralmigrationsofthe • verificationsystemduringthe last year: • libdwd GRIB-API (ECMWF) • GRIB1 GRIB2 • databaserequestinglayer (csobanksky) • NEC SX9 Cray XC30 M. Baldauf (DWD)
Winter 2012/13 Forecast day 1 low values for ETS and high values for FBI due to an unusual dry winter M. Baldauf (DWD)
Winter 2012/13 Forecast day 2 M. Baldauf (DWD)
Winter 2012/13 Forecast day 3 M. Baldauf (DWD)
Spring 2013 Forecast day 1 M. Baldauf (DWD)
Spring 2013 Forecast day 2 M. Baldauf (DWD)
Spring 2013 Forecast day 3 M. Baldauf (DWD)
Summer 2013 Forecast day 1 M. Baldauf (DWD)
Summer 2013 Forecast day 2 M. Baldauf (DWD)
Summer 2013 Forecast day 3 M. Baldauf (DWD)
Autumn 2013 Forecast day 1 M. Baldauf (DWD)
Autumn 2013 Forecast day 2 M. Baldauf (DWD)
Autumn 2013 Forecast day 3 M. Baldauf (DWD)