1 / 4

Numerical Weather Prediction at DWD

Numerical Weather Prediction at DWD. COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element: 49 km 2 COSMO-DE Grid spacing: 2.8 km Layers: 50 Forecast range: 21 h at 00, 03, 06, 09, 12, 15, 18, 21 UTC

ronia
Download Presentation

Numerical Weather Prediction at DWD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element: 49 km2 COSMO-DE Grid spacing: 2.8 km Layers: 50 Forecast range: 21 h at 00, 03, 06, 09, 12, 15, 18, 21 UTC 1 grid element: 8 km2 Global model GME Grid spacing: 40 km Layers: 40 Forecast range: 174 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element: 1384 km2

  2. Numerical Weather Prediction at DWD COSMO-DE Configuration • Grid spacing: x = 2.8 km • direct simulation of the coarser parts of deep convection • interactions with fine scale topography • Data assimilation using radar data (LHN) • Time step t = 25 sec • 421 x 461 x 50 grid points~ 1200 * 1300 * 22 km³lowest layer in 10 m above ground • 21-h forecasts from 00, 03, …, 21 UTC • boundary values from COSMO-EU(x = 7 km) • Operational: 16 April 2007

  3. New DWD Headquarters by June 2008 Offenbach, Frankfurter Strasse 135

  4. New DWD Supercomputer by June 2008 • Invitation to tender out in Q2, 2007 • Benchmark: Different resolutions of COSMO model • 3 companies bidding • Final decision will be announced by end of October 2007 • Installation phase I in 2008: 2 x 4.5 TFlop/s sustained • Installation phase II in 2010: Upgrade by at least a factor of 2 • Main cost driver: Ensembles (data assimilation, forecasting)

More Related