130 likes | 274 Views
President George Bush Turnpike Western Extension (SH 161). President George Bush Turnpike: Western Extension Completed roof slab for I-30 direct connector. President George Bush Turnpike: Western Extension Newly placed beams for direct connector over Forum Drive /Crossland Boulevard.
E N D
President George Bush Turnpike Western Extension (SH 161)
President George Bush Turnpike: Western Extension Completed roof slab for I-30 direct connector
President George Bush Turnpike: Western Extension Newly placed beams for direct connector over Forum Drive /Crossland Boulevard
President George Bush Turnpike: Western Extension Bridge supports for direct connector over PGBT WE frontage road
President George Bush Turnpike: Western Extension Placing formwork for bridge deck on direct connector from PGBT WE
President George Bush Turnpike: Western Extension Placing forms for bridge support at January Lane
President George Bush Turnpike: Western Extension New steel beams for direct connectors at I-30
President George Bush Turnpike: Western Extension New steel beams for direct connectors at I-30
President George Bush Turnpike: Western Extension Preparing ground for construction of main lane concrete pavement
President George Bush Turnpike: Western Extension Placing reinforcing steel cage for bridge support over I-30 entrance ramp
President George Bush Turnpike: Western Extension View of southbound direct connector and future main lanes below
President George Bush Turnpike: Western Extension Construction of new Jefferson St. bridge adjacent to UPRR tracks
President George Bush Turnpike: Western Extension Reinforced steel placement for Jefferson St. bridge foundation