President George Bush Turnpike Western Extension: Phase 4

President George Bush Turnpike Western Extension: Phase 4 Reinforcing steel for pavement approaching Mayfield Road overpass. President George Bush Turnpike Western Extension: Phase 4 Placing concrete for approach to Mayfield Road overpass.

selene
Download Presentation

President George Bush Turnpike Western Extension: Phase 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. President George Bush Turnpike Western Extension: Phase 4 • Reinforcing steel for pavement approaching Mayfield Road overpass

  2. President George Bush Turnpike Western Extension: Phase 4 • Placing concrete for approach to Mayfield Road overpass

  3. President George Bush Turnpike Western Extension: Phase 4 • Completed steel girder installation for direct connect ramps at I-20

  4. President George Bush Turnpike Western Extension: Phase 4 • Sound wall installation at South Fork Creek near Marshall Drive

  5. President George Bush Turnpike Western Extension: Phase 4 • Nighttime bridge deck concrete pour at Kirby Creek overpass

  6. President George Bush Turnpike Western Extension: Phase 4 • Pre-wetting reinforcing steel during nighttime bridge deck concrete pour

  7. President George Bush Turnpike Western Extension: Phase 4 • Construction and excavation activities at I-30

  8. President George Bush Turnpike Western Extension: Phase 4 • Bridge support construction at January Lane

  9. President George Bush Turnpike Western Extension: Phase 4 • Bridge support construction at January Lane

  10. President George Bush Turnpike Western Extension: Phase 4 • Pouring concrete for bridge support at January Lane

  11. President George Bush Turnpike Western Extension: Phase 4 • Excavation and hauling operations near I-30 interchange

  12. President George Bush Turnpike Western Extension: Phase 4 • Steel girder installation for direct connector bridge at I-30

  13. President George Bush Turnpike Western Extension: Phase 4 • Steel girder installation for direct connector bridge at I-30

  14. President George Bush Turnpike Western Extension: Phase 4 • Steel girder installation for direct connector bridge at I-30

  15. President George Bush Turnpike Western Extension: Phase 4 • Concrete girder for new I-30 direct connector bridge

  16. President George Bush Turnpike Western Extension: Phase 4 • Steel girder installation at PGBT WE and I-30 interchange