1 / 17

ILD Workshop 報告

ILD Workshop 報告. 2009 年 2 月 23 日 杉本康博. ILD とは. 2009 年 3 月末に ILC Research Director (RD) に Letter of Intent (LOI) を提出する予定の3つの測定器の一つ(他は SiD, 4th) GLD(Asia base) と LDC(EU base) が 2007 年 6 月 (LCWS07) に合体

maren
Download Presentation

ILD Workshop 報告

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILD Workshop 報告 2009年2月23日 杉本康博

  2. ILDとは • 2009年3月末にILC Research Director (RD)にLetter of Intent (LOI)を提出する予定の3つの測定器の一つ(他はSiD, 4th) • GLD(Asia base)とLDC(EU base)が2007年6月(LCWS07)に合体 • Gas baseのcentral tracker (TPC)とParticle Flow Algorithm (PFA)に最適化されたcalorimeterを持った大型汎用測定器

  3. LOI • ILC Detectorの “LOI” とは? • Letter of Intent to go to technical design phase • 2009年3月31日締め切り • International Detector Advisory Group (IDAG) によって “validate” され、2009年9月頃にIDAG reportが出る • Expected LOI content (M.Davier, LCWS08) • 約100ページ(書き足りない分はsupporting documents) • Detector philosophy, sub-detectors and alternatives • Evaluation of physics performances based on a common process benchmark list • Integration issues with accelerator • Status of a realistic detector model • Identification of state, plans and timescale for required R&D and technological options • Preliminary cost estimate • Structure of group and capacity to carry out the work • Resources needed as function of time for technical design

  4. ILD Workshop • 第1回 • 2008年1月14日~16日 • DESY Zeuthen • GLD-LDC 統一に向けた作業の開始 • 第2回 • 2008年9月11日~13日 • Cambridge • ILD主要パラメータの決定 • 第3回 • 2009年2月16日~18日 • 韓国・ソウル、梨花女子大 • LOI直前対策 • ~75人の参加者

  5. Seoul ILD WSの目的 • LOIの現状に関する議論 • Benchmark reactionのsimulation study • Detector optimization • Sub-detector design • Detector integration • LOI完成に向けて必要な重要項目についての共通認識を持つ

  6. Physics/Optimization session • Higgs recoil mass analysis • Study of ZH  nnqq • ZH  qqqq • Benchmark analysis of tau-pairs • SUSY point 5 chargino & neutralino: part-1 • SUSY point 5 chargino & neutralino: part-2 • ZHH at 500 GeV • WWnn / ZZnn at 1TeV • SPS1a’ stau polarization and mass measurement • SPS1a’ smuon, chargini, neutralino mass measurement • Model independent WIMP search • Non-pointing photons as signature for GMSB • Photon reconstruction in the ECAL • Higgs branching ratios for ZH  llqq • Polarization measurement from WW • Measurement of littlest higgs parameters at ILC • LHC/ILD SUSY fitting • Top pair production-1 • Top pair production-2 • Simulation studyはGRIDを活用 • しかしリソースの大部分はEU • (DESY, Lyon)にあり、KEKの • 寄与は小さい

  7. Sub-detectors session • Vertex detector • Silicon tracker • TPC • ECAL Si_W • ECAL Scintillator • Digital HCAL • Analog HCAL • FCAL

  8. MDI / Integration session • Progress on the yoke design • Integration of sub-detectors • Detector magnet design • Design principle of beam pipe • Wakefield, loss in the beam pipe • Integration discussion • Push-pull operation • R&Ds after LOI, focused on the engineering tasks

  9. Parallel session • Software tools • MDI / Integration • Vertex detector • Si tracking / General tracking • Calorimeter

  10. ILD design in LOI

  11. ILD design in LOI • Vertex detector (VTX) • Two options: 5-single layers v.s. 3-doublets • Four sensor options: CCD / CMOS / DEPFET / 3D

  12. ILD design in LOI • Si trackers • Si internal tracker (SIT: Si strip) • Forward tracking detector (FTD: Si pixel/strip) • Si external tracker (SET: Si strip) • Endcap tracking detector (EDT) • Central tracker • Time projection chamber (TPC) Beam pipe / VTX / SIT / FTD

  13. ILD design in LOI • ECAL • 2 options: Si-Tungsten v.s. Scintillator-Tungsten • Rin=1.85m ((GLD+LDC)/2) • 1cm2 cell size • HCAL • 2 options: Sci.-Fe (analog HCAL) v.s. RPC-Fe (semi-digital HCAL) • 3x3cm2 (A-HCAL) or 1x1cm2 (D-HCAL) cell size

  14. ILD design in LOI • Coil / Yoke • 3.5 T nominal, 4 T maximum • Coil: Rin=3.615m, Rout=4.0m, L=7.35m • Cryostat: Rin=3.44 m, Rout=4.34m • E=2.73 GJ@4T, E/M=11.9 kJ/kg • Stray field: 38 G at R=15 m (limit:50 G at 15m) • Magnetic force: 18500 ton on endcap yoke

  15. ILD design in LOI • Integration • CMS-like assembly • Barrel: 3 rings / Endcap: 3 parts/side (?) • Surface assembly  Put down to underground by 2000t crane • Endcap opening • Rear part is split into 2 / Front part is one ring • Small opening (gap~1m) at beam position • Big operation at garage position

  16. ILD design in LOI ILD proposal of the cavern/shafts

  17. ILD LOIの現状 • ~80%完成(既に100ページを超えてしまった) • 著者:~220 (Feb.15) • アジアが非常に少ない今後の増加を期待(努力) Asia

More Related