WIPP Preliminary Documented Safety Analysis for TRUPACT-III. URS Washington TRU Solutions James McCormick. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III.
E N D
WIPP Preliminary Documented Safety Analysis for TRUPACT-III URS Washington TRU Solutions James McCormick
WIPP PDSA for TRUPACT-III DOE-Standard - 1189 Major Modification Evaluation Criteria • Criteria 3 - Change an existing process or add a new process resulting in the need for a safety basis change requiring DOE approval? YES • Criteria 4 - Utilize new technology or government furnished equipment (GFE) not currently in use or not previously formally reviewed /approved by DOE for the affected facility? YES
WIPP PDSA for TRUPACT-III DOE-Standard - 1189 Major Modification Evaluation Criteria • Criteria 5 - Create the need for new or revised safety SSCs? POTENTIAL • Criteria 6 - Involve a hazard not previously evaluated in the Documented Safety Analysis (DSA)? POTENTIAL
WIPP PDSA for TRUPACT-III Overcome Configuration Control Challenge • Centralized configuration control • Concurrent review on multiple documents • Parallel DOE and URS comment resolution • Comment review cycles compressed
WIPP PDSA for TRUPACT-III Result • Conservative SS SSCs downgraded • No new safety-related SSCs or SACs • New and revised hazard analysis bound by existing DSA Revision 2. • TRUPACT-III Readiness on time.