An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. February 2010Justin McNew Status of 1609.11

  2. Contents Status Comment Resolutions Target Schedule

  3. Status: General • Draft 3.0 will be released week of February 8 • Annex A is complete • Annex B still in question

  4. Status: Draft 3.0 Annex A Security • Completed Annex A security content • Authored by William Whyte • Security primitives have been added or enhanced • Security requirements are in place (subclause A.6) • Encryption and decryption shall be performed using the AES algorithm in CBC mode • Authentication algorithm shall be AES-CMAC • Key derivation algorithm shall be AES-256 single-block encryption • Requirements are defined for the payer and payee Payment Service to maintain keying and keying-related material

  5. Status: Draft 3.0 Annex A PSID Allocation • Annex A WAVE services will use PSIDs between TBD1 and TBD2 inclusive: Request 5 PSIDs (4 will be reserved in first publication)

  6. Status: Draft 3.0 Annex B • Annex B: Maintain or remove? • Some changes were made per comment resolutions • Next steps for Annex B – we may leave it as is and address the data formats, security, and data flows as there becomes more of a market need (follow up standard), or remove it and explore a follow on PAR to develop Annex B in explicit detail. • Recommendation: remove it for this publication version

  7. Status: Draft 3.0 Annex C (PICS Table) • A PICS table was added as Annex C • Annex A statements are in place in some detail • Annex B depending on direction of WG

  8. Comment Resolutions Received 23 comments from 3 commenters – Thank You!

  9. Comment Resolutions, part 1

  10. Comment Resolutions, part 2

  11. Comment Resolutions, part 3

  12. Comment Resolutions, part 4

  13. Comment Resolutions, part 5

  14. Comment Resolutions, part 6

  15. Target Schedule 1609.11 December 2009 – Comments resolution round 2, D3.0 February – Documents with editorial cleanup finalized in WG; D3.0 approved, ready for IEEE editorial review Sponsor Ballot and REVCOM schedule in line with to .3/4