60 likes | 179 Views
MTS42 TD25 Agenda Items 4.1 and 4.2.1. Anthony Wiles ETSI PTCC. STFs. MTS STF295 (extension): IPT Library Started MTS STF296: SIP test maintenance Francois Fischer MTS STF PO : Generic IP Testing Framework CfE issued Prep meeting 3 rd May
E N D
MTS42 TD25Agenda Items 4.1 and 4.2.1 Anthony Wiles ETSI PTCC
STFs • MTS STF295 (extension): IPT Library • Started • MTS STF296: SIP test maintenance • Francois Fischer • MTS STF PO : Generic IP Testing Framework • CfE issued • Prep meeting 3rd May • OCG/MTS STF PQA: Standards Engineering Process • First call attracted only one applicant • Second call issued (prep meeting in May?) • New STF • IPv6 Phase 1 maintenance?
STF 276 Outputs Phase 1 • All deliverables completed • IPv6 Testing Framework • Published (update due end 2006) • IPv6 Requirements Catalogue • On line as part of IPT Library (STF295) • Test specifications • Interoperability test specifications • Conformance test specifications • TTCN-3 Library • On line as part of IPT Library (STF295) • All tests are validated (probably 30% of the effort) • On ETSI IPv6 Testbed • For more info visit: www.ipt.etsi.org
Results Phase 1 • Over 1100 Core IPv6 Requirements identified • Including 3GPP • 300 Core IPv6 conformance tests • fully validated • except for a few due to restrictions of the testbed • 120 Core IPv6 Interoperability Tests • fully validated
Status of Resources Phase 1 • All funded 432 days used. No overrun. • At least 170 days of voluntary expert resource • 110 promised • Probably 150 days of PTCC resource • 130 days promised • 60 inkind days (meetings) registered • 60 days promised • No more activity in 2006 except for some dissemination (Beijing) • Small return of travel budget • EC Interim Report approved • EC Final Report in progress (due end of April)